Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
Im
GD
rm
=
iS
5m RIPARIAN BUFFER FROM INVERT
5m RIPARIAN BUFFER FROM TOP OF BANK
[TT] tom riparian BUFFER FROM TOP OF BANK
Serer
LOT OR INFRASTRUCTURE INSIDE RIPARIAN BUFFER
(TOTAL AREA 340 SQUARE METRES)
ADDITIONAL RIPARIAN BUFFER OFFSET (PRELIMINARY AREA
580 SQUARE METRES, SUBJECT TO FLOOD MODELING)
EXISTING TOP OF BANK
FINAL Q100
——— --———___ PROPOSED LAY BACK TYPE INVERT LINE KERB &
CHANNEL M1 TO IPWEAQ STD DWG R-0080
=—= SW _ PROPOSED STORMWATER PIPE
+ 5 PROPOSED INTERLOT DRAINAGE PIPE WITH
—_ RAINGARDEN
+ —*— PROPOSED INTERLOT DRAINAGE PIPE
WITH PITS
PROPOSED BIORETENTION BASIN
PROPOSED VEGETATED
BIO-RETENTION SWALE
WLLL, “NOR CHANNEL
INVERT PROFILING
ji 100
gf 9P218739
@/ RESERVE
BUFFER AREAS
INFILL PLANTING TO
ACHIEVE PLANT DENSITY
OF 1 PLANT/1.5m? eo
=
Ny
we
x
~/
WESTERN TRIBUTARY a
WESTERN BANK — RIPARIAN BUFFER AREA
PLANT AREA TO ACHIEVE PLANT DENSITY OF
1 PLANT/1.5m?. CURRENTLY RIPARIAN AREA
FROM TOP OF BANK LIMITED TO GRASS
NATURE VEGETATION PRESENT ON BANKS
7 = Fao |
L
ACTIVE
4
7 PARKLAND
J 685m? he
$— ~~ x Fa100
FLUSH KERB ON
RESERVE _BDY
PREVIOUS ROAD 22
35
} 32 +
A a
WEST SIDE OF ROAD1 a
7
EASTERN TRIBUTARY ;
A
—S
27
RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM BANK
USED FOR START OF BUFFER
26
Sm WIDE CLEAR AREA
BEHIND LOTS FoR,
e* 25,
ACCESS OR SERVICES
RP1 73883
J
. 11
EASTERN BANK — RIPARIAN BUFFER AREA ‘
PLANT 70% OF AREAS TO ACHIEVE PLANT
DENSITY OF 1 PLANT/1.5m’. REMOVE WEEDS
A
12
100
NO RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM INVERT |.
USED FOR START OF BUFFER | »
a
PURPLE AREA — INFILL PLANTING | |
REQUIRED FOR 30% OF AREA 10 N
ACHIEVE 1 PLANT/1.5m?
( Callaghan & Toth )
Civil, Environmental &
Hydraulic Engineers
PO BOX 2305
NOOSA HEADS 4567
i! 8/41 Sunshine Beach Road
=| Phone 54749081, Fax 54749041
www.callaghanandtoth.com.au
designed | ADT datum AHD DERIVED
drown BM ye
PS
checked | AH Origin (B.M.) RL *
approved
SURVEYED _BY
MAX WATTERSION & ASSOCIATES
PHONE 54 426 121
a
(SS
project
PROPOSED 31 LOT SUBDMSION
55 LAKE MacDONALD DRIVE
COOROY
Client
VALKEV PTY LTD
$d
_O——————————L————,
title
RIPARIAN ZONES STAGE 3 & 5
—_
_—_—————————————————————.
LOT 136 on MCH978
Parish of TEWANTIN
County of MARCH
SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD
Ce )
_—————————————————
SCALE
0.5 10.15 20 25 Meters 50
SS
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
( DO_NOT SCALE FROM THIS DRAWING
1:1000(A3) USE ONLY DIMENSIONS PROVIDED
REVISIONS
re detai
~|
FILES
COMPUTER DIRECTORY
X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald Drive\\Design\Current_DWG—BASE
PRELIMINARY
Sheet 1 of 10 sheets
drawing number
1225-33
date 10-3-14 yy,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.