Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                              Callaghan & Toth


6.       CONCLUSIONS & RECOMMENDATIONS
An integrated water management approach has been used to assess the site’s stormwater
requirements and water management needs. In summary:

        The proposed reconfiguration at 55 Lake MacDonald Drive and Pearsons Road from
         four (4) lots into Fifty-seven (57) lots can be treated by a stormwater treatment train
         consisting of:
         o One medium Bioretention Basin (BioBasin 1)(already completed for Stage 1 i.e. Lots
             1 to 4),
         o Two large Bioretention Basins located in park treating runoff from Lots 5 to 16 and
             associated road reserve for BioBasin 3 and treating runoff from Lot 33 to 57 for
             BioBasin 2.
         o Three small Roadside Bio Basins treating runoff from Lots 20 to 25 and associated
             road reserve,
         o Two Bioretention swales treating runoff from Lots 17,19, 29 to 32 and associated
             road reserve,
         o Three Raingardens for Lots 26, 27 & 28, and
         o A grassed buffer for the road joining the new development to Blue Wren Place.

        This proposed stormwater treatment train achieves the current best practice load based
         reduction targets as prescribed in the Water by Design Deemed to Comply Solutions –
         Stormwater Quality Management (South East Queensland) version 1.0 – Table A-2
        The new lots have sufficient flood free areas to build residential infrastructure in
         accordance with Council’s requirements.
        The increased flood storage achieved with the measures:
                    o Detention volume in Bio Basins 2 and 3,
                    o Watercourse reshaping for the Western tributary,
                    o Revegetation of riparian areas to “roughen” the catchment, and
                    o Constructing a restrictive footbridge across the eastern tributary;
         Allows attenuation of the runoff concentrations back to Pre Development levels and so
         the development will not have an impact on the hydrology of the downstream receiving
         waters.




55 Lake MacDonald Drive – Stage 1 to 5                                                   pg. 24
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.