Log in to see the plans as drawn4.0 MAINTENANCE MANUAL
4.1 BIORETENTION SYSTEMS MAINTENANCE PROCEDURES
Objective To maintain the bioretention systems to ensure that it continues to remove pollutants from stormwater runoff, as
intended during the design phase including:
Bioretention Basins 1, 2 and 3
Bioretetnion Swales 1 and 2
Roadside BioBasins 1a, 1b and 2
Actions Description Responsibility Timeframe
General Remove accumulated litter / debris to pond and grates Developer Every three months for first
Maintenance year of operation – during
Remove accumulated sediments at inlet On-maintenance period
Remove impermeable layer if water ponds for more than a
few hours
Remove weeds and dead plants
Replace plants where necessary
Water plants as necessary
Reinstate areas that have eroded and holes in media
Ensure energy dissipation at entry and exit points is adequate
and repair if necessary
Control erosion and sediment loss upstream or within system
where necessary
Check builders working upstream block inlet to biopod with
filter bags and ring edge with sediment fence. If not compliant,
ring building compliance officer.
Following Off- Remove accumulated litter / debris to pond and grates Council Every six months (or as
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.