Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                              Callaghan & Toth

LIST OF REFERENCES

1.       Department of State Development, Infrastructure and Planning, “State Planning Policy”,
         December 2013
2.       Engineers Australia, “Australian Runoff Quality Guidelines”, 2006.
3.       Healthy Waterways, “Water Sensitive Urban Design Technical Design Guidelines for
         South East Queensland”, 2006.
4.       Water by Design, “MUSIC Modelling Guidelines for South East Queensland” – Version
         1, December 2010.
5.       Water by Design, “Deemed to Comply Solutions – Stormwater Quality Management
         (South East Queensland)”, Version 1.0 May 2010
6.       Wong, T., Breen, P. & Lloyd, S., “Water Sensitive Road Design – Design Options for
         Improving Stormwater Quality of Road Runoff. CRC for Catchment Hydrology Technical
         Report No 00/1”, 2000.


LIST OF FIGURES

Figure 1.1                  Site Location Plan……………………………………………………………...7
Drawing 1225-50             Reconfiguration Layout Plan………………………………………………….9
Figure 3.1                  Stormwater Layout – Stage 1, 2, 3 & 5.……………………………… ……10
Figure 3.2                  Stormwater Layout – Stage 4…. …………………………………………...11
Figure 4.1                  MUSIC Model for the Proposed Development…………………………….13
Figure 4.2                  Typical Bioretention Basin Detail…..……………………………………….19
Figure 4.3                  Typical Kerbside Basin and Raingarden Detail……………………………20
Drawing 1225-33             Riparian Zones Stage 3 and 5………………………………………………23



LIST OF TABLES

Table 4.1                   MUSIC Catchment Areas……………………………………………………14
Table 4.2                   Comparison of Load Reductions……………………………………………16
Table 4.3                   Design Features of Stormwater Treatment Systems……………………..20
Table 5.1                   Pre-Development and Post Development Discharges……………………21




55 Lake MacDonald Drive – Stage 1 to 5                                                  pg. 4
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.