Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                             Callaghan & Toth


1.       SUMMARY
The key points of this investigation are as follows:
   1. Runoff from new roadways, footpaths and allotments is to be cleaned of nutrients and
      gross pollutants via a stormwater treatment system prior to being released to existing
      waterways.
   2. The stormwater treatment system includes:
                   a. One small Bioretention Basin (already completed for Stage 1)
                   b. Two medium Bioretention Basins located in park,
                   c. Three small Roadside Bio Basins,
                   d. Two Bioretention swales,
                   e. Three Raingardens for Lots 26, 27 & 28, and
                   f. One Grassed Buffer.
   3. The increase in pollutant loads due to the increase in impervious areas is to be
      attenuated.
   4. Stormwater Detention is to achieve no increase in runoff concentration by the following
      measures:
                   a. Riparian vegetation planting to attenuate flood flows:
                   b. Pedestrian bridge over the eastern tributary (off Lake MacDonald Drive)
                       to attenuate flows;
                   c. Detention storage in Bioretention Basin 2 and 3;
                   d. Reshaping of the western tributary (off Blue Wren Place) to provide
                       greater flood storage.




55 Lake MacDonald Drive – Stage 1 to 5                                                 pg. 5
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.