               Head Works
               30.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of September 2004 under the current policies is as follows:

                        Water Supply     $4,269

                        Sewerage         $2,915

                        TOTAL            $7,184

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.
               Earthworks
               31.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
                      fences or structures that border the development site. Fences that are affected shall be
                      replaced prior to plan endorsement. In this regard any fences to be replaced shall be clearly
                      shown on the plans submitted for Operational Works approval.
               Site Stability
               32.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
                      determine the soil classification, establish whether any measures are required to protect the
                      stability of adjoining buildings and/or structures, and make recommendations on the type of
                      system to retain adjoining land and the foundation system(s) best suited for the proposed
                      development. This information shall be submitted to the Council prior to obtaining a
                      Development Permit for Operational Works.
               Erosion and Sediment Control
               33.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
               General
               34.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               35.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.
               36.    he transportation of all materials to and from the site shall be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying materials either to
                      or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
               37.    A Registered Professional Engineer of Queensland shall certify engineering drawings and
                      specifications for all engineering works, which shall be submitted in conjunction with an
                      application for a Development Permit for Operational Works.


                                                                                                        Page 5 of 8
Document Set ID: 24833834
Version: 4, Version Date: 03/06/2026

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132004 4552 02 (As Published).pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.