                                              Officer:          Denis Wallace
                                              Direct Telephone: (07) 5449 5179
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2007/2399
                                              Your Reference:   IC0108NAM0002_NOO7610
24 October 2008

Department of Natural Resources & Water
PO Box 573
NAMBOUR QLD 4560



Dear Madam

                                      Decision Notice
                                   Integrated Planning Act 1997

Your Department was an advice agency for the above application and provided advice to Council in
a letter dated 7 February 2008. On 23 October 2008, Council decided to approve the application in
full subject to conditions.

Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2007/2399
    Street address:                  Leslie Drive, Noosa Heads
    Real property description:       Lot 3 SP 178323
    Planning Scheme:                 Superseded Planning Scheme (Schedule to the Planning
                                     Scheme & Strategic Plan 1997)

2        DECISION DETAILS

The following type of approval has been issued:
        Development Permit for Material Change of Use - 27 Dwelling Houses
        Development Permit for Reconfiguring a Lot - Lot Reconfiguration
3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Land Use
Approved Plans
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are numbered:



                                                                                         Page 1 of 24
Full text of the other 23 pages

Page 2

                                                                                           2007/2399



 Plan / Document No.       Rev.    Plan / Document Name                           Date
 M1806-10                          Proposal Plan – Stage 1 – Jones Flint &        30 October 2007
                                   Pike Pty Ltd
 M1806-11A                 A       Proposal Plan – Stage 2 – Jones Flint &        7 November 2007
                                   Pike Pty Ltd

and as may be amended by these conditions.
General
2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
3.   The Detached Houses shall comply with the Detached House Code contained in The Noosa
     Plan, with the exception of the requirement for eaves overhangs (roof form).
4.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
     with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
     Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
     Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
     System, or current equivalent standards as may apply. All tap ware and shower roses shall not
     exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded
     from this requirement.
Landscaping & Existing Vegetation
5.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
     qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
     the premises being occupied and maintained at all times thereafter and shall include:
         Street trees and landscaping treatment within the common property and easement areas
          of the development.
         Screening vegetation along the line of play of the golf course to protect the allotments and
          detached houses from stray golf balls. The vegetation shall consist of native endemic
          trees and shrubs at densities sufficient to provide a physical screen; and
         Koala and glossy back cockatoo feed trees shall be incorporated into the plantings;
     The landscaping is to be completed in accordance with the approved landscaping plan prior to
     endorsement of the Plan of Survey for Stage 2.
6.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
7.   All other vegetation shall be protected from interference resulting from clearing or construction
     activities by:
         Clearly marking vegetation to be retained with flagging tape;
         Installing protective fencing around the drip line of the vegetation;
         Stockpiling, storage and vehicle parking occurs in already cleared areas that does not
          cause interference with vegetation; and
         Low impact construction techniques are used around vegetation to minimise interference
          with the vegetation.

                                                                                         Page 2 of 24

Page 3

                                                                                      2007/2399



8.    A fauna spotter shall be employed to oversee the removal of any native trees within the site.
9.    Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
         Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
          loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum
          of 10 metres between edges of heaps.
         Disposal for firewood.
         Disposal for landscaping purposes.
         Transport to alternative site for breaking down materials provided that all necessary
          permits have been obtained to allow the alternate site to be used for this purpose.
         The disposal method for clearing vegetation is to be submitted in conjunction with an
          application for a Development Permit for Operational Work. The Applicant is advised that
          other methods may be considered provided full details of the method are submitted.
         The Applicant is advised that burning off is an unacceptable method of disposal.
Compliance Bond
10.   Security in the form of a cash bond or trading bank guarantee to the sum of $50,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
11.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
Currency Period
12.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 23 October 2012, unless an application to extend the currency is approved by
      Council.
Land Development
Staging
13.   The development may be undertaken in the following stages:
         Stage 1 - Lots 8 & 9 as indicated on Proposal Plan M1806-10 dated 30 October 2007; and
         Stage 2 - Lots 1 to 27, Access Easement and Common Property as indicated on Proposal
          Plan M1806-11A dated 7 November 2007.
Plan Endorsement
14.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
      documentation shall be presented to Council and shall be submitted in the correct form with
      the fees prescribed in Council's adopted fee schedule.
15.   Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
      charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
      paid prior to endorsement of the Plan of Survey for each stage.
16.   Prior to Council endorsement of the Plan of Survey for each Stage, a duly executed copy of
      any required Grant of Easement shall be submitted to Council for perusal.
      Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
      Survey.
                                                                                    Page 3 of 24

Page 4

                                                                                         2007/2399



      Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
      the endorsing of the Plan of Survey.
17.   Prior to the endorsement of the Plan of Survey for each Stage, the Applicant's Solicitor shall
      give Council's Solicitor an appropriate undertaking in writing that in conjunction with lodgement
      of the Plan of Survey at the Land Titles Office, the Title Deed and the easement documents
      will also be lodged and any additional Titles Office forms or requisitions requiring the consent
      of Council being attended to forthwith.
18.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works, which shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
19.   Prior to Council endorsing the Plan of Survey for Stage 2, a certificate from a registered
      Professional Civil Engineer shall be submitted to Council for each Development Permit for
      Operational Works issued pursuant to this permit. The engineer shall certify that he has
      supervised those works and that they have been completed in a workman like manner in
      accordance with good engineering practice and in accordance with that permit.
      A Development Permit for Operational Works covering landscaping must be obtained prior to
      the commencement of any landscaping works.
20.   Any alteration of a public utility or other facility necessitated by the development of the land or
      associated construction works either internal or external to the site shall be at no cost to
      Council.
Access Easement
21.   An access easement shall be created over all of the proposed private roads/driveways within
      the Precinct J. The proposed access easement in favour of Council for maintenance of the
      sewer system shall be over the common property area shown on Proposal Plan M1806-11A
      dated 7 November 2007.
      The easement shall be in favour of Council and shall ensure that Council has access over
      these roads to enable maintenance of the sewer network. In this regard, plans submitted for
      Operational Works approval shall accurately show the location of the easement. In addition to
      this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing
      that the Title Deed and the easement documents will be lodged at the Land Titles Office and
      any additional Titles Office forms or requisitions requiring the consent of Council will be
      attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing. Any changes required by Council’s Solicitor must be corrected immediately.
22.   Access easements shall be created within the relevant sections of the proposed private
      roads/driveways (common property area) as shown on Proposal Plan M1806-11A dated 7
      November 2007 to enable golf course users and staff to cross the private road to access the
      golf course and to access the machinery/maintenance sheds.
      The easements shall be in favour of the Golf Course owner and shall ensure that the Golf
      Course owner has access over the relevant sections of the proposed private roads/driveways
      (common property area). In this regard, plans submitted for Operational Works approval shall
      accurately show the location of the easement. In addition to this the Applicant’s Solicitor shall
      give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the
      easement documents will be lodged at the Land Titles Office and any additional Titles Office
      forms or requisitions requiring the consent of Council will be attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing. Any changes required by Council’s Solicitor must be corrected immediately.



                                                                                      Page 4 of 24

Page 5

                                                                                     2007/2399



Internal (Private) Roads
23.   Prior to endorsement of the Plan of Survey for Stage 2, a private road shall be constructed
      within the proposed common property area generally as shown on Plan M1806-11A dated 7
      November 2007. The private road shall be designed and constructed:
         With a minimum width of 5.5 metres kerb to kerb and widened where necessary to permit
          access for Council’s Refuse/Recycling vehicles in accordance with Council’s Planning
          Scheme Policy 9 – Waste Management,
         To include the provision of kerb and channel, asphaltic concrete pavement and formed
                                                                                           5
          footpath. It shall also meet Council’s pavement standard for a local road (2 x 10 ESA’s).
24.   To ensure pedestrian safety between vehicles utilising the private road and pedestrians on the
      footpath, the private road and any associated fencing or vegetation near the private road shall
      comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4 and/or
      Austroads whichever is the greater. The applicant shall demonstrate compliance by
      illustrating these sight lines on the plans submitted for Operational Works approval.
25.   The applicant will construct a pedestrian refuge for users of the Links Drive pathway on the
      access road to the site within Council’s road reserve.
External Roadworks
26.   The existing roundabout on Links Drive at the entrance to the site shall be modified by the
      applicant to accommodate Council’s largest refuse collection vehicle should the current design
      be insufficient to allow the right turn into the development. If required the applicant shall
      dedicate the necessary road reserve to accommodate the redesigned roundabout. All
      associated and ancillary work including pavement correction to the existing pavement,
      drainage works, modification of the footpath, and adjustments to the existing infrastructure
      shall be undertaken to complete the roadworks widening.
Frontage Works
27.   If any necessary footpath improvements such as topsoiling, grassing, and tree planting are
      required to the Links Drive frontage of the site as a result of roadworks and to achieve
      required sightlines, those works shall be in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines.
28.   A new 1.5 m wide concrete path shall be constructed along one side all of the private roads on
      the site in accordance with Council’s design standards and shall connect to the existing
      pathway on Links Drive.
29.   Pram ramps shall be installed on the Links Drive pathway at the location of the pedestrian
      refuge that is to be constructed on the leg of the roundabout servicing the proposed
      development.
30.   All paths, pram ramps, driveways and parking areas shall be designed and constructed to
      ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish,
      and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
      1428.1 Design for Access & Mobility.
31.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.

Car Parking
32.   Carparking shall be provided within the site as shown on Plan M1806-11A dated 7 November
      2007 as submitted by Jones Flint & Pike except as modified herein for at least 14 spaces. The
      carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user
      class 1. The minimum head clearance (headroom) at any point shall be 2.3m.
                                                                                   Page 5 of 24

Page 6

                                                                                      2007/2399



33.   The carparking area shall be drained and the sealed pavement constructed to access road
      standards. Plans and specifications for these works shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
34.   All carparking shall be kept maintained and line-marked in a condition fit for use to the
      reasonable satisfaction of Council.
Power
35.   An underground electricity service shall be provided to each lot.
      In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
      with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.

      The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to Council endorsing the Plan of Survey.
      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
      be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
      purchasers of the proposed lots.
36.   Street lighting and pathway lighting throughout the subdivision shall have a high energy
      efficient rating to the reasonable satisfaction of Council and shall generally be provided in
      accordance with the principles of Council’s Engineering Design Standards.
Telecommunication
37.   The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
      provision of new underground telephone services to the proposed lots. In this regard written
      confirmation from an approved telecommunication agency shall be submitted to the Council
      prior to Council endorsing the Plan of Survey.

Roof Water
38.   Roof runoff from any new dwelling/building shall be directed to a rainwater storage system or
      tank that is installed to ensure water from the rainwater storage system or tank is used for
      external uses (such as watering gardens, irrigation, ornamental ponds, water features,
      topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in
      washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
      installed in accordance with the Queensland Development Code (QDC) current at the time of
      building approval, and shall be part of the plumbing application for approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system.
Stormwater Management
39.   A Stormwater Management Plan (SMP) for the construction and operational phase of the
      development shall be submitted in conjunction with any application for a Development Permit
      for Operational Works that demonstrates that the proposed stormwater treatment train can
      meet the water quality objectives for the Noosa Springs development and that the lakes have
      the capacity to treat the runoff from this additional development. Experts in the relevant field
      shall prepare the SMP.
40.   The authors of an SMP shall be responsible to oversee that the SMP is carried out and to take
      appropriate action in the event of any breach of the SMP likely to cause environmental harm.
41.   All stormwater drainage shall be designed in accordance with the provisions of the Australian
      Rainfall and Runoff (A.R.R.), and Noosa Council Standards. Pipe and channel drainage
      systems shall be designed to cater for Five (5) year Average Recurrence Interval design storm
      (ARI.). In all cases the major event surface flow paths shall be designed to cater for the one
      hundred (100) year ARI.
                                                                                    Page 6 of 24

Page 7

                                                                                       2007/2399



42.   As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed
      within the site to collect and discharge stormwater runoff from all adjoining properties to
      prevent additional ponding/flooding on these properties.
43.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the private roads/driveways shall have the
      first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross
      pollutant trap provided on site prior to being permitted to discharge into the lakes.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly onto the golf course, bypassing the grease/oil
      arrestor/gross pollutant trap.

      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
44.   All site stormwater drainage shall be by means of a gravity system.
45.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
      circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.

Sewer Mains
46.   Prior to endorsement of the Plan of Survey for Stage 1, the new parcel shall be connected to
      Council’s existing sewerage reticulation systems and be constructed in accordance with
      Council’s standards and requirements at no cost to Council. This work may be covered by an
      uncompleted works bond at 150% of the value of the connection that can be in place for a
      duration agreed to by the Manager Land Development.
47.   Prior to endorsement of the Plan of Survey for Stage 2, the existing sewer main, rising main
      and effluent main that traverse the site shall be relocated generally in accordance with Tate
      Professional Engineers drawing No. C1732/07/J/P04 dated 19/11/07.
48.   Prior to endorsement of the Plan of Survey for Stage 2, if required the applicant shall upgrade
      any existing sewer services (including pumps or pump station) at no cost to Council.
49.   To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.




                                                                                     Page 7 of 24

Page 8

                                                                                        2007/2399



50.   Design for a sewerage system to connect all new lots within the site to Council's existing
      sewerage reticulation system shall be to the standards and requirements set out in Council’s
      Engineering Design Standards. If the design requires the construction of a pump station and a
      rising main, the connection point to Council's existing system will be nominated by the
      Manager - Land Development.
51.   All connections to sewer system shall be carried out either by Council or by a Council
      approved Contractor and at no cost to Council.
Town Water Supply
52.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
53.   Prior to endorsement of the Plan of Survey for Stage 1, the newly created parcel shall have a
      single water connection to the water reticulation system, which shall extend to the property
      boundary and be metered. This work may be covered by an uncompleted works bond at
      150% of the value of the connection that can be in place for a duration agreed to by the
      Manager Land Development.
54.   Prior to endorsement of the Plan of Survey for Stage 2. the development shall be served by:
         A single Body Corporate water meter to measure the total water consumption (including
          fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
         Individual water meters to each tenement capable of being separately rated, and
         A fire service (fully testable single detector check with metered bypass), where applicable,
          for flows to fire hydrants and fire sprinkler systems (excluding fire hose reels).
55.   All fees for the supply of water meters shall be paid to the Council.
56.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
57.   Fire hydrants are to be provided throughout the development in accordance with Council
      Engineering Design Standards and in accordance with Queensland Fire Service Standards.
58.   Any connection to a water main shall be undertaken by Council.
Service Easements (Sewer / Stormwater)
59.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works / Building Works approval. To this extent the surveyor shall certify that
      the sewer and the zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

                                                                                      Page 8 of 24

Page 9

                                                                                             2007/2399



      Any changes required by Council’s Solicitor must be corrected immediately.
60.   A registered easement shall be created over any stormwater drainage discharge points from
      the proposed Stages 1 or 2 to enable that Stage to discharge stormwater onto the golf course
      parcel. Easements shall also be created if required to allow Council’s road reserve and the
      golf course to discharge onto Stage 1 or 2.
61.   Registered easements are to be provided on the Plan of Survey over all sewerage mains
      within private property. Easements are to be equivalent in width to twice the depth to invert
      level of the sewer at the deepest point within the allotment. Easements are to be provided
      parallel to and centred over the sewer line, with a minimum width of 3.0 metres.
62.   No building or other structure shall be constructed or encroach over an easement.
63.   Any building or structure within proximity of an easement or any other public utility’s
      underground must have its foundations designed so that no surcharge loads are imposed
      upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
      below a line of influence measured 1.0m in the direction of the foundation from the centreline
      of the closest underground service and along the natural angle of repose of the foundation soil
      type(s).
      Plans, and supportive documents, detailing these proposed foundations shall be designed by
      a registered practicing Geotechnical Engineer and submitted with the application for a
      Development Permit for Operational Works.

Earthworks
64.   A registered practicing Geotechnical Engineer shall test the existing ground conditions for
      suitability of placing additional fill, prior to such fill being placed.
      Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper
      to the existing levels prior to the rear boundary of the property. Batters shall be at a maximum
      grade of 1:4 unless retained by a wall.

      Any existing fill or natural materials on the site or with the extent of approved works external to
      the site which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's
      requirements shall be removed and replaced with suitable material.
65.   Following completion of the filling works and prior to endorsement of the Plan of Survey for
      Stage 2, the registered practicing Geotechnical Engineer supervising the works shall submit
      compaction tests across the entire filled areas and a site classification report for each lot
      subject to filling. The extent of fill and each lot site classification shall be shown on a metes
      and bounds survey plan.
      An appropriate property notation shall be placed on Council's rates records to advise
      prospective purchasers of lots that have been filled that special foundations requirements will
      apply.

Acid Sulfate Soils
                                                                                                  3
66.   As the site is located below the 5m AHD, any excavation works consisting of 100m or greater
                                                   3
      and/or any filling works consisting of 500m or greater and with an average depth of 0.5m or
      greater will need to be carried out in accordance with State Planning Policy 2/02 Planning and
      Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
      supporting documentation prepared by a suitably qualified specialist shall be submitted to
      Council for approval prior to obtaining a Development Permit for Operational Works.
67.   As the subject site is likely to contain Acid Sulfate Soils, Council wishes to make the applicant
      aware of their obligations in terms of good environmental practice, which requires that Acid
      Sulfate Soils:-
         should not be removed from the site,
                                                                                           Page 9 of 24

Page 10

                                                                                       2007/2399



         should not be disturbed, if possible, and
         should be treated and neutralized on site where required.
      In the event that Acid Sulfate Soils are removed from site and forwarded for disposal at one of
      Council’s landfill sites, Council may:-
         refuse to accept such soil, or
         treat and neutralize the soil and charge such costs for soil testing and remediation to the
          applicant and or developer of the site.
Site Stability
68.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures and/or land, and make recommendations on
      the type of foundation system(s) best suited for the proposed development. The
      recommendations of this report shall be incorporated into the design and construction of the
      proposed development.
Erosion and Sediment Control
69.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

Vegetation Protection & Preservation
70.   All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
      Stock Route Management) Act 2002 are to be controlled on the site prior to Council
      endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
      pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
      threaten environmentally significant areas of the site such as riparian zones and areas of
      natural vegetation. Where class 3 plants are removed as a result of this condition and there is
      not sufficient natural regeneration of native species, the areas shall be replanted with endemic
      native species so that a sustainable natural ecosystem is restored.
      Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
      weed treatment and replanting is complete
71.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
72.   Where retained tress are located in areas proposed to filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling works
      will need to incorporate terracing around the tree or a similar means of ensuring that the
      natural ground level around the trees remains generally the same as existing. These
      measures shall clearly be shown on the plans submitted for Operational Works approval and
      any drainage required to drain these areas shall also be shown on the plans.

                                                                                    Page 10 of 24

Page 11

                                                                                       2007/2399



Contributions Towards Council Infrastructure
73.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:


                                                                                  Amount:
       Contribution Required For:
                                                                    Stage 1       Stage 2           TOTAL
       PSP12 – Public Open Space Contributions (Park)                $ 3,126     $ 81,286           $ 84,412
       PSP16 – Sewerage Headworks Contributions                       $1,318       $34,270           $35,588
       PSP17 – Water Supply Headworks Contributions                   $4,892      $127,204          $132,096
       PSP20 – Pathway Trunk Network Contributions                      $703       $18,271           $18,974
       TOTAL Contribution Amount =                                  $ 10,039      $261,031          $ 271,070
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from JUNE 2008 until the date of payment.

      All contributions must be paid prior to Council endorsement of the plan of survey.

General
74.   A suitably qualified Registered Professional Engineer Queensland shall prepare engineering
      drawings and specifications for all engineering works, which shall be submitted in conjunction
      with an application for a Development Permit for Operational Works. In this regard a
      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
      conjunction with any application for Operational Works.
75.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational
      Works in respect of roadworks and stormwater drainage works. The design shall be in
      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
      Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
      existing and proposed services required by the development shall be shown on the plans.
76.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
77.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
78.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
79.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
80.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
                                                                                    Page 11 of 24

Page 12

                                                                                      2007/2399



      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).

      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
81.   The proposed names of new roads (public and private) and parks shall be lodged with the
      application for a Development Permit for Operational Works.
      Names are to be selected from any of the following categories:-
       Easily pronounced words of Murri languages.
       Names or words of local significance or historical interest.
       Flora, fauna, industry, topographical, geological and similar features and terms relative to
          the district.
       Surnames of persons of merit or historical significance. (Personal names should be
          avoided.)
      Approval will not be given to a name that is the same or similar to the name of another road in
      the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
      pronounced, or may cause confusion to emergency services are to be avoided.
      All street signs on new roads (public and private) and parks shall be erected prior to works
      being accepted on maintenance. For private roads and parks, Council will provide the
      nameplate and signpost to the Applicant upon payment of $250 per sign.
Environmental Health
82.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No.9
      “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, Must be
      submitted for the day-to-day operation of the development and approved by Council’s
      Environmental Health prior to the issue of a Development Permit for Operational Works.
      The plan shall include the following information:-

         Refuse bin collection locations for general and recyclable waste;
         Road measurements; and
         Turning circles for refuse collection bins demonstrating suitable manoeuvring areas within
          the internal road network;

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency       Referral Address

 Site contains               Concurrence         Department of         PO Box 573
 assessable vegetation                           Natural Resources     NAMBOUR QLD 4560
                                                 & Water

 Acid Sulfate Soils at or    Advice              Department of         PO Box 573
 below 5m AHD and                                Natural Resources     NAMBOUR QLD 4560
 involves filling of                             & Water
        3
 1000m or more

 Site adjoins National       Advice              Environmental         Ecoaccess Customer
 Park                                            Protection Agency     Service Unit
                                                                       PO Box 15155
                                                                       CITY EAST QLD 4002
A copy of any referral agency conditions is attached.
                                                                                   Page 12 of 24

Page 13

                                                                                                 2007/2399



6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.              Rev.     Plan / Document Name                        Date
 M1806-10                                  Proposal Plan – Stage 1 – Jones Flint &     30 October 2007
                                           Pike Pty Ltd
 M1806-11A                        A        Proposal Plan – Stage 2 – Jones Flint &     7 November 2007
                                           Pike Pty Ltd

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The applicant is informed that the site is identified as a Koala Living Area under the Nature
      Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and may
      contain koalas. The use of a Koala Spotter is encouraged in areas where koalas are likely to
      occur, prior to the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and Melaleuca
      species. Further information can be obtain from the Environmental Protection Agency at
      <http://www.epa.qld.gov.au> or Ph. (07) 32278185.
2.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
                 On a Sunday or public holiday, at any time; or
                 On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
3.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-

                            Existing Development                           Approved Development
          STAGE




                     Existing Use                                   Approved Use
                                          Existing Quantity                            Approved Quantity
                      Class / Use                                    Class / Use
                                                                     Open Space                1 x Lot
                                                                      Recreation
                     Open Space                                             +                     +
          1                                      1 x Lot
                     Recreation                                     Multiple Housing    1 x Detached house
                                                                      - Type 4 –       lot within a group title
                                                                     Conventional            subdivision

                   Multiple Housing       1 x Detached house        Multiple Housing   27 x Detached house
          2          - Type 4 –          lot within a group title     - Type 4 –       lot within a group title
                    Conventional               subdivision           Conventional            subdivision

4.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of Stage 1 = $2,905 and Stage 2 = $75,522 (TOTAL
      = $78,427) and is subject to variations in the Consumer Price Index, All Groups Brisbane from
      JUNE 2008 until the date of payment. An Infrastructure Charge Notice will be issued in
      accordance with Chapter 5 of the Integrated Planning Act 1997.
                                                                                              Page 13 of 24

Page 14

                                                                                          2007/2399



5.    The applicant is informed that payment via credit card transaction will not be an acceptable
      method of payment for development contributions conditioned in this permit or for
      infrastructure charge notices issued separately.
6.    The following property note (or similar) will be placed on Council’s rates records for the new
      allotments:
      "This property is close to Noosa Coastal Wastewater Treatment Plant. Whilst computer odour
      modelling has determined that the development complies with the Queensland Odour Amenity
      Guideline, odour may be detected at some times."
7.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
8.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
9.    The applicant is advised that this development may require the provision of fire hydrants and a
      booster pump in accordance with the Building Code of Australia, and consultation may also be
      needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
      provided. To this end any necessary fire hydrants shall be clearly shown on the plans
      submitted for both Operational Works and Building Works approval and if a booster pump is
      deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
      order to provide boosting to the water supply.
10.   For the purpose of these conditions, the following definitions apply: -
      A.       A Plan of Survey means the plan for the reconfiguration of a lot required to be
               endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
      B.       A Registered Professional Civil Engineer (RPEQ) means a civil engineer who is
               registered in Queensland pursuant to the Professional Engineers Act 1988.
      C.       Carparking area means a parking area as defined in the Schedule to the Shire of
               Noosa Planning Scheme inclusive of manoeuvring areas and access from the
               roadway.
      D.       The person acting on this permit means any person or company who undertakes
               development pursuant to this permit.
      E.       AS 2890.1 – 2004 means Australian Standard for Off Street Carparking - AS 2890.1-
               2004.
      F.       Principal Contractor means the person nominated by the Applicant and approved by
               the Manager - Land Development at a pre-start meeting as being responsible for the
               major component of works associated with a Development Permit for Operational
               Works of any works on the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
                                                                                       Page 14 of 24

Page 15

                                                                                       2007/2399



You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

The following property note (or similar) will be placed on Council’s rates records for the new
allotments:
This property is close to Noosa Coastal Wastewater Treatment Plant. Whilst computer odour
modelling has determined that the development complies with the Queensland Odour Amenity
Guideline, odour may be detected at some times.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development     Permit    for   Operational   Access and/or Carparking, Site Civil Works,
 Works                                         Roadworks, Stormwater Drainage, Frontage Works,
                                               Sewer Reticulation (including new mains, relocations,
                                               diversions, pump stations and rising mains), Water
                                               Reticulation, Earthworks, Landscaping & Erosion &
                                               Sediment Control

11    SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code
Detached House Driveways Code

12    SUBMISSIONS
There was one (1) properly made submission and two (2) not properly made submissions about the
application. In accordance with Integrated Planning Act 1997, the name and address of the principal
submitter for each properly made submission is provided and attached.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Find that the following grounds are sufficient to support the proposal despite the conflict with the
Superseded Planning Scheme:
1.    The scale of the development will not exceed that anticipated by the approved Plan of
      Development for the site;

2.    The Plan of Development provides for residential development to extend beyond the
      boundaries of the identified residential precincts;

3.    The proposal will not unduly compromise the existing golf or recreational facilities within Noosa
      Springs estate or the Noosa Heads locality; and

4.    The proposed development is compatible with the general amenity and character of Noosa
      Springs; and



                                                                                    Page 15 of 24

Page 16

                                                                                     2007/2399



14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,



Kerri Coyle
MANAGER – LAND USE




                                                                                  Page 16 of 24

Page 17

                                                                2007/2399



                        List of Submitters
                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




Peter & Heather Monks
39 Jolly Street
CLAYFIELD QLD 4011




                                                             Page 17 of 24

Page 18

                                        2007/2399



Referral Agency Conditions –
Department of Natural Resources &
Water
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                     Page 18 of 24

Page 19

   2007/2399




Page 19 of 24


[OCR of page images]
2007/2399

 

If the disturbance of ASS cannot be avoided, the potential impacts of that disturbance
must be treated and managed to:
© neutralise existing acidity and prevent the generation of acid and metal
contaminants; and
* avoid releasing surface or groundwater flows containing acid and metal
contaminants into the environment.

The following advice is offered on whether the application demonstrates that the
proposed development can achieve Outcome 1 of SPP 2/02.

Background

ASS mapping’ shows part of the site in an area mapped as likely t to contain ASS, with
the remainder low probability. Geology mapping shows the site as quaternary coastal
wetlands. Surface elevations range from 1.5m to 9m AHD.

The planning reports states that excavations below 5m AHD are not anticipated,
however they are not able to rule this out due to exact details only being known once
Council have approved and conditioned the application. Accordingly, they request
that preparation of an ASSMP be imposed as a condition.

The Engineering Report states that filling of the south west corner of the site will be
required, with minimal earthworks in the remainder of the site to provide the cut to fill
earthworks for the new roadworks profile, and infrastructure trenching.

A lake appears to be proposed as part of the realignment of the 18" tee.

ASS Investigation Report

The following advice is offered on the preliminary ASS investigation undertaken by
Golder Associates and dated October 2007. NRW notes that the report is
preliminary due to details of the proposed earthworks and buildings were not known
at the time of reporting.

The ASS investigation revealed the presence of ASS in the southwest comer of the
site.

With respect to SPP 2/02 and related guidelines’, the ASS investigation is deficient in
the following areas:
« the number of boreholes — 2 were tested as part of the ASS investigation
instead of 6;
* the number of samples analysed — 6 in the two boreholes, instead of 6 per
borehole.

NRW support the proposal to drill 4 additional boreholes once more detailed
information is available on the proposed development.

In order for the ASS investigation to be consistent with SPP 2/02 and related
guidelines, NRW recommend further ASS investigations which address the
deficiencies detailed above.

! Acid Sulfate Soils - Tweed Heads to Nerang River. NR&M, 2003

> NR&M & DLGP, (2002) State Planning Policy 2/02 Guideline

Ahern CR, Ahem MR and Powell B (1998). Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils
(ASS) in Queensiand. Department of Natural Resources, Indooroopilly.

Ahern CR, McElnea AE and Sullivan LA (2004). Acid Sulfate Soils Laboratory Methods Guidelines. In Queensland
Acid Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly,

Dear SE, Moore NG, Dobos SK, Walling KM and Ahern CR (2002). Soil Management Guidelines. in Queensland
Acid Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly.

Dear SE, Moore NG, Watling KM, Fahl D and Dobos SK (2004). Legislation and Policy Guide. In Queensland Acid
Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly,

The Department of Natural Resources and Water ICO103NAMO002 "pots

Page 19 of 24

Page 20

   2007/2399




Page 20 of 24


[OCR of page images]
2007/2399

 

ASS Management Plan

An ASS management plan (ASSMP) has not been undertaken, due to details of
earthworks not being available, however basic management strategies have been
mentioned in the ASS investigation.

Referral Agency Recommendations

NRW consider that the information provided with the application does not adequately
demonstrate that the proposed development can achieve Outcome 1 of SPP 2/02.

In order for the ASS investigation to be consistent with SPP 2/02 and related
guidelines, NRW recommend further investigations as detailed above. This could be
undertaken as a condition of approval.

NRW recommend that an ASSMP be undertaken consistent with SPP 2/02 and
related guidelines. This could be undertaken as a condition of approval.

While NRW offers this advice under SPP 2/02, it remains the duty of care of the site
owner not to cause Environmental Harm as defined under the Environmental
Protection Act 1994.

. Third Party Matters
The Chief Executive of the Department of Natural Resources and Water provides the
following advice to assist the Assessment Manager to fully consider the application.

Aboriginal Cultural Heritage Act 2003

NRW also takes this opportunity to advise Council of the responsibilities of applicants
under the Aboriginal Cultural Heritage Act 2003. Council may wish to include this
information as an Advisory Note on the Decision Notice issued for the application.

Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries
out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage (the “cultural heritage duty of
care"). Maximum penalties for breaching the duty of care are $750,000 for a
corporation and $75,000 for an individual.

Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if
they are acting in accordance with cultural heritage duty of care guidelines gazetted
under the Aboriginal Cultural Heritage Act 2003, available on the NRW website, or in
accordance with an agreement with the Aboriginal party for the area or a cultural
heritage management plan approved under part 7 of the Aboriginal Cultural Heritage
Act 2003,

Applicants are also encouraged to undertake a search of the Aboriginal Cultural’

Heritage Database and the Aboriginal Cultural Heritage Register, administered by the
Cultural Heritage Coordination Unit, Department of Natural Resources and Water.
Application forms to undertake a free search of the Cultural Heritage Register and
the Database may be obtained by contacting the Cultural Heritage Coordination Unit
on (07) 3238 3838 or on the NRW website www.nrw.qid.gov.au/cultural_heritage.

. Authorised Delegate Signature

Asn
Ken Murray
Principal Natural Resource Officer

The Department of Natural Resources and Water ICO108NAMO002 . 30f5

Page 20 of 24

Page 21

   2007/2399




Page 21 of 24


[OCR of page images]
2007/2399

 

South East Region

7 February 2008

The Department of Natural Resources and Water ICO108NAMO0002 4ofs

Page 21 of 24

Page 22

   2007/2399




Page 22 of 24


[OCR of page images]
2007/2399

 

Glossary

Clearing as a result of the MCU/RaL includes:
« Clearing as a result of the MCU; and
+ Clearing as a result of the RaL.

Clearing as a result of the MCU includes:
¢ clearing of assessable vegetation that will result from the change in use,
consisting of any of the following
- Clearing for infrastructure—including buildings, stormwater management
systems, water supply and sewerage systems—that are proposed as part
_ Of the MCU application
— clearing for roads, vehicle parking, vehicle and pedestrian access, utilities
corridors, services, fences, firebreaks and fire management lines that are
proposed as part of the MCU application
- Clearing that may not be necessary for developing infrastructure but is
associated with the use applied for.
And
¢ clearing of assessable vegetation that will become exempt if the development
application is approved. This includes any of the following examples
— clearing for routine management and essential management purposes
associated with the approved development including clearing to maintain
proposed infrastructure, facilities, roads, access routes, utilities, services
and fences, and clearing to maintain the safety of persons and property
that will be associated with the development
— clearing for necessary fire breaks and fire management lines associated
with the development. This will be assessed as follows
i. all built infrastructure other than underground services, roads and
fences will be assessed as requiring clearing for firebreaks with a
width of 1.5 times the height of the tallest vegetation adjacent to the
infrastructure, or 20m, whichever is the greater. However, evidence
may be provided to NRW that confirms that an alternative firebreak
width is required that is consistent with the State Planning Policy
(SPP) 1/03 Guideline
ii- all proposed allotment boundaries will be assessed as requiring
clearing for fire management lines with a width of 10m constructed
on either side of the allotment boundary, unless NRW is provided
with evidence that confirms that an alternative width of fire
management line is required or an alternative configuration of fire
management lines are required that is consistent with the SPP 1/03
Guideline
iii, in the case of evidence being presented that demonstrates
alternative fire management guidelines as being sufficient and
consistent with the SPP 1/03, NRW may condition the development
so that the full extent of exempt clearing prescribed for essential
management under Schedule 8 of the IPA cannot be carried out by
current or future landholders
- where there is a concurrent application for Reconfiguring of a Lot (RaL)
for the same land that has not yet been decided—clearing as a result of
the RaL as set out in the RaL Policy item 2 will be assessed,

The Department of Natural Resources and Water ICO108NAM0002 50f5

Page 22 of 24

Page 23

                                                                                                      2007/2399



                                                     Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a currency period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the currency period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a currency period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                  Page 23 of 24

Page 24

                                                                                                   2007/2399

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
    change or cancel a condition of a development                 currency period;
    approval.                                               (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval,
    including any condition applying to the
    development, and the identification of a code
    under section 3.1.6;3
(c) the decision to give a preliminary approval when a
    development permit was applied for;


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                               Page 24 of 24

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUEPRSEDED Decision Notice - Advice Agency - DNRW [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.