PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 08 AUGUST 2017
Olivine Lane
10. The existing access driveway from Olivine Lane may be retained provided that certification
from a Registered Professional Engineer of Queensland (RPEQ) is submitted to Council.
The certification must state that the driveway is in good order and is suitable for the intended
use. If the certification cannot be provided the existing driveway must be removed and
replaced with a compliant driveway.
Performance Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
pre-start meeting. The cash bond or trading bank guarantee will be returned on performance
of the conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or guaranteed
sum to effect compliance with conditions.
Building Appearance
12. All air conditioning units or other mechanical equipment must be located at ground level, or
otherwise fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties.
Fencing and Walls
13. Any street fencing must be set back an average of 1 metre from the front property boundary.
Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
14. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Car Parking
15. Car parking spaces must be provided and marked on the site in accordance with the
approved plans. The car parking must include in particular cross falls and gradients in
accordance with Australian Standard AS/NZS2890.1:2004.
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge.
17. The development must be constructed so as not to concentrate or redirect stormwater runoff
onto neighbouring properties.
Electricity and Telecommunication Services
18. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
19. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
20. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Easements
21. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 10 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.