PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 08 AUGUST 2017
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures.
c. Works programme identifying key components of the works and their respective
durations.
d. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
e. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures.
37. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction must be notified to Council in writing within five business days of the
change occurring.
38. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Landscaping Works
39. The development must be landscaped in accordance with these conditions and the approved
landscape plans prior to the commencement of use.
40. A minimum pot sized 100L street tree must be installed in the Tewantin road frontage and:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
c. Be of an approved Council species suitable for the location and of local origin.
d. Planted in accordance with Planning Scheme Policy 3 Landscaping Plants and
Guidelines.
41. Landscape works must be supervised, undertaken and certified by a horticulturist. All works
must be completed in accordance with this Decision Notice.
DURING CONSTRUCTION
Engineering
42. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
43. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit.
44. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
c. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Page 13 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.