PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 08 AUGUST 2017
OPERATIONAL WORKS
APPROVED PLANS
30. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
1622-01 C Site Plan prepared by Callaghan and Toth for that part June 2017
within the subject site
1622-02 C Driveway Layout & Sediment Control Plan prepared by June 2017
Callaghan and Toth for that part within the subject
site
1622-03 C Driveway Detail Plan prepared by Callaghan and Toth June 2017
for that part within the subject site
1622-06 C Structural Detail Plan prepared by Callaghan and Toth June 2017
for that part within the subject site
1622-07 C Driveway Longitudinal Section prepared by Callaghan June 2017
and Toth for that part within the subject site
T42L1 Landscape Plan 15.03.2017
PRIOR TO COMMENCEMENT OF WORKS
Engineering
31. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
32. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “pre start” meeting.
33. A condition report including photographs of the frontage of the site (Olivine Lane and
Tewantin Road) must be completed and submitted to Council at the prestart meeting / prior
to any works commencing.
34. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council at the prestart meeting.
35. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Other relevant parties
36. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
iii. Proposed fencing to the site during the construction phase of the development;
iv. Adequate parking arrangements for construction workers.
Page 12 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.