23. Roadworks must be provided within the proposed 3.0m wide “Public Thoroughfare”
easement adjacent to the northern boundary of the site, extending from the eastern
side of the bin area to remaining length of the northern boundary. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. 2.0m wide concrete pavement along full length of the easement. The formation
must be designed to cater for the potential future use by vehicles and be in
accordance with Council’s Planning Scheme Policy 5 – Engineering Design
Standards – Roads, Drainage and Earthworks.
b. Landscaping works to provide a suitable visual screening buffer between the
building and the easement with a minimum garden bed width of 800mm.
c. Pram ramps where required.
d. Any necessary alteration and reinstatement works beyond the boundary of the
site to connect and match existing public carparks or pathways pavements.
Site Access and Driveways
24. A sealed access driveway must be provided from Doonella Street to all parking and
maneuvering areas of the development generally in accordance with the approved
plans (16416–SD02 dated 02/05/2017 by Archicology). The works must be undertaken
in accordance with an Operational Works approval and must include in particular:
a. A driveway crossover 4.0m wide with grades generally in accordance with
IPWEAQ standard drawings SEQ R-049 and R-050 with line marking and
modified driveway tapers at 45 degree at the kerb line to encourage left-in and
left-out from the site (refer to Parking & Traffic Impact Assessment Report –
Addendum 1, Reference 210442017TIA-Add, dated 21 April 2017 by Greys
Australia Pty Ltd).
b. Signage and linemarking in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) installed within the site to indicate left-out only traffic.
c. Grades to allow for a compliant concrete pathway along the frontage.
d. Any landscaping, fences and fixtures near the access entry point must comply
with AS 2890.1 requirements for sight visibility for pedestrians and cyclists at
driveways.
Frontage Reinstatement Works
25. All redundant driveways and existing kerb laybacks along the frontage of the site must
be removed and the kerb, footpath and verge area reinstated to match the balance of
the site frontage, including the provision of topsoil and turf where the existing verge is
grassed. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. The existing driveway layback be removed and the kerb reinstated to match the
type and alignment of the adjoining existing sections of kerb line. The driveway
layback must be saw-cut and removed to allow for a smooth and neat join finish
between the new and the existing kerb.
b. Reinstatement of concrete footpath to provide even and consistent gradients in
longitudinal and across profiles generally in compliance with IPWEAQ standard
drawing SEQ R-065 Concrete Pathway Construction Details, this may
necessitate replacement of sections of the existing footpaths beyond the edges
of the redundant driveways and the frontage of the site.
Page 41 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.