20230025_RECOR_MCU Engineers Letter_20.12.24
20th December 2024
Ref: 20230025_Rev1
Noosa Council Ref: MCU24/0074
Noosa Council
9 Pelican Street
Tewantin QLD 4565
Dear Andrew Gaffney,
Attention: Mr Andrew Gaffney
Dear Sir,
Re: MCU - Information Request - Engineers Letter
At: 203 – 207 Gympie Terrace, Noosaville QLD 4566
With reference to the abovementioned project, RECOR’S stormwater management report
(20230025-SWMP01, Date: 30/05/2024, Rev 1) and upon review of the Information Request
issued by Noosa Council (Reference: MCU24/0074, Date: 08/07/2024), RECOR have
included a summary response to the information request items below. The civil design have
been revised as required to reflect these addressed items and have been attached to this
letter.
Please note, the civil drawings now reflect the latest revised architectural drawings by Arkos
Architects (Project No. 2404, Date: 12.12.2024, Issue: A).
• Item 23 – The drawings have been updated to include the new bioretention basin
location and size.
• Item 28 – The drawings have been revised to include the updated carpark,
motorcycle and loading bay dimensions and turning circles (swept paths) for B99
vehicles only.
• Item 33 – The drawings have been revised to include commentary notes advising
that commercial waste will be taken in wheelie bins to Thomas street every morning
and residential waste will be taken via wheelie bins once a week to Albert street. No
waste vehicles will require access to site.
• Item 34 to 36 - commentary on how the performance of the water quality and
drainage code has been addressed has been outlined below:
As the proposed development site is greater than 2,500m2 in area, the development will
be required to meet water quality design objectives outlined in the State Planning Policy
(2017) and Council’s Water Quality and Drainage Code (2020). The proposed development
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 20 pages
Page 2
site will be required to achieve the following design objectives for operational stormwater
quality.
Table 1 - Operational Water Quality Objectives
Pollutant Percentage Reduction Target (%)
Total Suspended Solids (kg/yr) 80
Total Phosphorus (kg/yr) 60
Total Nitrogen (kg/yr) 45
Gross Pollutants (kg/yr) 90
Water Quality Modelling
Details of the proposed treatment train are provided in RECOR’S SWMP. Further details of
the proposed devices and preliminary sizing are provided below. Locations of the
proposed devices are shown on the revised civil drawings.
Bioretention Basin
Table B in Appendix 2 of the State Planning Policy (2017) states that “In lieu of modelling,
the default bio-retention treatment area to comply with load reduction targets for all
Queensland regions is 1.5 per cent of the contributing catchment area”. MUSIC modelling
has not been undertaken for sizing of the proposed bioretention basin. The proposed
bioretention basin has been sized at 1.5% of the contributing catchment area in lieu of
MUSIC modelling.
It is proposed to provide a bioretention basin design for this project generally in
accordance with the following typical section.
Figure 1 -Typical Cross Section of a Bioretention Basin
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 3
The bioretention basins will be designed in accordance with Water By Design’s Bioretention
Technical Design Guidelines (2014). Planting will be provided in accordance with Council’s
requirements.
Atlan Basin
The Atlan Basin is an advanced prefabricated, compact and self-contained stormwater
treatment system that provides similar treatment to a bioretention area.
Preliminary sizing was requested from Atlan for the proposed Atlan Basin. Atlan undertake
their own in-house MUSIC modelling and provide recommended sizing for their products
to meet the required water quality objectives. Attached in Appendix A is a drawing of the
recommended unit. Below is a typical detail of the proposed unit.
Figure 2 -Atlan Basin Typical Detail
Atlan have recommended that their Stormsack product is installed to all inlet pits upstream
of the Atlan Basin to collect Gross Pollutants at source.
The Atlan Basin is a SQIDEP certified device having treatment efficiency that meets the SPP
water quality objectives. Below is output provided by Atlan from their MUSIC model for this
particular site. The modelling indicates that the proposed unit meets the water quality
objectives for the site.
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 4
Figure 3 - Atlan Basin – Treatment Train Effectiveness
Atlan Hydrochannel
The Hydrochannel is an insert that can be placed inside a channel grated drain of 300mm
wide, and at least 450mm deep. It is designed for areas that would benefit from at source
stormwater treatment, which would otherwise be bypassed. This allows stormwater from
high traffic areas (car parks and roads), industrial areas and metal roofs to be cleaned at site
level, and then discharged locally.
The Atlan Hydrochannel is a SQIDEP certified device having treatment efficiency as shown
in Table 2.
Table 2- Tested Treatment Efficiencies
Pollutant Efficiency (%)
Total Suspended Solids (kg/yr) 88
Total Phosphorus (kg/yr) 69
Total Nitrogen (kg/yr) 67
Gross Pollutants (kg/yr) 100
The hydrochannel is proposed to capture and treat runoff from the driveway area. A surface
solution is required in this location due to limited cover and depth to invert of existing
downstream drainage pipes.
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 5
• Item 37 to 39 – Upon review, there is a none net worsening of site conditions in
regards for potential flooding when comparing existing to the new development
finished ground levels. All surface drainage is directed towards new on site drainage
pits connected to the existing stormwater system and or overland flow is directed to
existing kerb and channels.
• Item 40 and 41 – The drawings have been revised to include an updated
earthworks layout.
Trusting the above is to your satisfaction and should further information be required please
contact this office.
Yours faithfully,
RECOR Pty Ltd
Signature
Blake Wetherall
Structural Engineer
BEng (Hons)
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 6
Document control record
Document prepared by:
RECOR Pty Ltd
ABN 89 647 469 707
75 Noosa Dr
Noosa Heads, QLD 4567
Australia
T +61 7 5211 1003
E [email protected]
W recorconsulting.com
A person using RECOR documents or data accepts the risk of:
a) Using the documents or data in electronic form without requesting and checking
them for accuracy against the original hard copy version.
b) Using the documents or data for any purpose not agreed to in writing by RECOR.
a) Document control
Report title MCU - Information Request - Engineers Letter
Document code 20230025- Project number 20230025
01RPT
File path
Client Gympie Terrace PTY LTD
Client contact Client reference -
Rev Date Revision Author Review Verifier Approver
details/stat er (if required)
us
1 20/12/20 For client B. J. J. Overell
24 Wethera Overell
ll
Current revision 1
Approval
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 7
Author signature Approver
signature
Name Blake Name Josh Overell
Wetherall
Title Structural Title Managing Director
Engineer
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 8
Appendix A P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 9
Stormwater Quality Improvement Device Evaluation Protocol (SQIDEP) –
VERIFICATION CERTIFICATE
Applicant Information
Applicant Name SPEL Stormwater Pty Ltd
Applicant Address 100 Silverwater Rd, Sydney, NSW 2128
Phone Number +61 1300 773 500
Fax Number N/A
Email [email protected]
Website www.spel.com.au
Verified Technology
SPELBasin®
Issue Date 25th September 2020
Reviewed Documents • Associate Professor Terry Lucke and Ms Oriana Sanicola, Evaluation of Treatment
Performance of SPEL Basin at Sippy Downs, May 2018, Stormwater Research
Group, University of Sunshine Coast.
• Dr Darren Drapper and R. Biggins, Field Monitoring of a SPEL
Basin at University of Sunshine Coast, 90 Sippy Downs Dr, Sippy Downs QLD
4556, Issue 1, Drapper Environmental Consultants, 10 October 2019.
• SPEL Basin Monitoring setup (digital video)
• SPEL Basin Technical Design Guideline, revised August 2020.
• Dr Darren Drapper and E. Hancock, Field Monitoring of a SPEL
Basin at University of Sunshine Coast, 90 Sippy Downs Dr, Sippy Downs QLD
4556, SQIDEP Body of Evidence Application Supplementary Report, Issue 1,
Drapper Environmental Consultants, 31 July 2020
Page 10
Verification Certificate – SQIDEP VC
Reference Number: SA-2019/009/VC
Technology Information
Applicant’s
Verified Total Suspended Solids (TSS) 86 %
Performance Total Phosphorus (TP) 65 %
Claims Total Nitrogen (TN) 50 %
Total Petroleum Hydrocarbons 0 %
Gross Pollutants 99 %
Others, please detail:
____________________________________________________
Maintenance
performed • The inlet chamber and StormSack was maintained once annually during monitoring;
during • No maintenance was performed on the planted media;
monitoring • The SPELBasin® Technical Guideline recommends maintenance of the inlet chamber and
Stormsack quarterly;
Verified • The submitted, calibrated MUSIC model provides a method of modelling the technology
method to with 1 Generic node as per the image below;
model in
MUSIC
•
The input criteria for the node is;
o Generic node
High Flow Bypass 0.01 m3/s
Gross Pollutants Input = 150 mg/L Output = 1.5 mg/L
Total Suspended Solids Input = 1000 mg/L Output = 140 mg/L
Total Phosphorus Input = 10 mg/L Output = 3.5 mg/L
Total Nitrogen Input = 50 mg/L Output = 25 mg/L
Conditions The limitations of the acceptance of these claims include;
• The results are for a road-based catchment. The results lie within acceptable inflow
limits for this type of catchment and based on the analysis are found to be acceptable.
This does not necessarily relate to other catchment types, though it noted that hard
stand catchments will behave similarly. Cleaner, roof catchments
may not achieve the same pollutant reduction targets;
• The results are for a hydraulic loading rate up to 250m/year. Should the hydraulic load
rate exceed this, the results and life expectancy of the media would be expected to
decline in line with excessive loading on the device;
• The results are reliant on the maintenance of the device being consistent with the
manufacturers guidelines and those that are contained in the report. Most importantly
2
© Stormwater Australia
Page 11
Verification Certificate – SQIDEP VC
Reference Number: SA-2019/009/VC
the cleaning of the Storm Sack and filter cartridge at regular intervals;
• The life expectancy of the device and the media is unknown. In discussions with the
manufacturer the testing is consistent to at least the 6 year mark. It is suggested that
an estimated lifespan of both media and the whole device be written into any technical
guidelines as the filter material will deteriorate over time;
• The acceptance of these results is reliant on the installation being similar to that shown
in this analysis. Alternative installations may result in different outcomes;
• Designs & Installations of the SPELBasin® are in accordance with the SPEL Stormwater
SPELBasin® Technical Guidelines; and
• If the media is observed to not fully drain down to its lowest level within 2 hours
following an event, investigate the media permeability, and if required replace media.
Independent
Reviewers Mr Chris Beardshaw, Afflux Consulting
Mr Mark Liebman, Sustainability Workshop
Accepted by
Governance 24/9/2020
Panel
Accepted by
Stormwater 25/9/2020
Australia
Board
3
© Stormwater Australia
Page 12
6 5 4 3 2 1
900 4200 900
D D
A A
1340
OUTLET
PLAN VIEW
C C
FLAUSHOUT PORTS INLET WATER OUTLET WATER ISOMETRIC VIEW
TRANSFER SYSTEM TRANSFER SYSTEM
E:\Vault Working Folder\Designs\SPEL\PRODUCTS\BASIN\MODULAR WETLAND-2021\MWS-L-4-21 (12Lps)\STANDARD\SP21-MB19950-S.idw
INFLOW GATE
SPEL STORMSACK
600 X 600
OUTLET WATER
CONTROL & RISER
1290
B B
OUTLET
PRETREATMENT CHAMBER BIOFILTRATION CHAMBER DISCHARGE CHAMBER
COARSE SEDIMENT
OUTLET WATER
RIGHT END VIEW
FILTER MEDIA FILTER
TRANSFER SYSTEM OUTLET
6020
6120
ELEVATION VIEW
SECTION A-A
TOLERANCE: All Dimensions to Closest 10 mm & +/- 30 mm ALL INTERCONNECTING PIPEWORK, PITS AND ASSOCIATED DRAINAGE BY OTHERS
The drawings must not be disclosed to any third PROJECT :
CLIENT: parties without written permission from SPEL STORMWATER . Drawn Date
Unauthorised disclosure may result in prosecution. M.MAKIN 13/04/2021
SPEL STORMWATER - This drawing is the property of SPEL
STORMWATER ABN: 83 151 832 629 and is subject to return on Check Date TITLE
A demand. It is submitted for the use only in connection with the
proposal and contracts of SPEL STORMWATER with the expressed
SPEL BASIN A
conditions that it is not to be reproduced or copied in any form. Verified Date MODULAR WETLAND SYSTEM 2.0
This data must only be used in accordance with our standard MWS-L-4-21 - 10 LPS - SPEL STORMSACK
terms and conditions.
Copyright Approved Date GENERAL ARRAGEMENT
SPEL STORMWATER accepts no responsibility for any loss or
damage resulting from any person acting on this information. SCALE SIZE SHEET REV
The details and dimensions contained in this document may change, A3 1 1
N.T.S
please check with SPEL STORMWATER for confirmation of current Request No.
1 INITIAL RELEASE M.MAKIN 13/04/2021 CUSTOMER CODE : DWG No.
specifications. RN3345
REV DESCRIPTION DESIGNER DATE CHECKED BY 16385-TD SP21-MB19950-S
6 5 4 3 2 1
Page 13
6 5 4 3 2 1
B
D D
A A
B GRATED LID
600 x 600
PLAN VIEW
C C
OVERFLOW
C:\Users\smart\OneDrive\Documents\Vault\Designs\ATLAN\01 - STANDARDS\ATLAN FLOWGUARD\FLG.750\FLG.750.idw
FOLDED DEFLECTOR
VARIES
POLY SEDIMENTATION
CHAMBER
GRANULATE
FILTER CUSHION
B B
INFLOW
INNER 750
y y
SECTION B-B
INNER 1000
SECTION A-A
TOLERANCE: All Dimensions to Closest 10 mm & +/- 30 mm ALL INTERCONNECTING PIPEWORK, PITS AND ASSOCIATED DRAINAGE BY OTHERS
CLIENT: The drawings must not be disclosed to any third
Drawn Date PROJECT :
parties without written permission from ATLAN STORMWATER .
Unauthorized disclosure may result in prosecution. R.J. 22/04/2024
© ATLAN STORMWATER - This drawing is the property of ATLAN
STORMWATER ABN: 83 151 832 629 and is subject to return on Check Date TITLE
A demand.It is submitted for the use only in connection with the
proposal and contracts of ATLAN STORMWATER with the expressed
ATLAN FLOWGUARD A
conditions that it is not to be reproduced or copied in any form. Verified Date FLG.750
This data must only be used in accordance with our standard GENERAL ARRANGEMENT
terms and conditions.
© Copyright Approved Date
ATLAN STORMWATER accepts no responsibility for any loss or
damage resulting from any person acting on this information. SCALE SIZE SHEET REV
The details and dimensions contained in this document may change, A3 1 1
N.T.S
1 22/04/2024 R.J. INITIAL RELEASE please check with ATLAN STORMWATER for confirmation of current Request No.
specifications. CUSTOMER CODE : DWG No.
REV DATE BY DESCRIPTION CHK FLG.750
6 5 4 3 2 1
Page 14
Stormwater Quality Improvement Device Evaluation Protocol (SQIDEP)
VERIFICATION CERTIFICATE
Applicant Information
Applicant Name SPEL Stormwater Pty Ltd
Applicant Address 130 Sandstone Pl, Parkinson QLD, 4115
Phone Number +61 1300 773 500
Email [email protected]
Website www.spel.com.au
Verified Technology SPEL Hydrochannel
Issue Date 22nd June 2021
Reviewed Documents • University of the Sunshine Coast, Stormwater Research Group,
Evaluation of Treatment Performance of SPEL Hydrochannel at
Sippy Down, Final report May 2018
• Dr Darren Drapper, R. Biggins, SPEL Stormwater, Field Monitoring
of a SPEL Hydrochannel at University of Sunshine Coast 90 Sippy
Downs Dr, Sippy Downs QLD 4556, SQIDEP Supporting
Information, Issue 1, 19th March 2021.
• Dr Darren Drapper, R. Biggins, B. Jedras, SPEL Stormwater, Field
Monitoring of a SPEL Hydrochannel at University of Sunshine
Coast 90 Sippy Downs Dr, Sippy Downs QLD 4556, SQIDEP
Supporting Information, Issue 2, 23rd March 2020.
• Drapper Environmental Consultants, USC SPELBasin &
Hydrochannel Sample Collection Procedure
• SPEL Hydrochannel setup (device and sampling) (digital video)
• Chain of Custody documentation and Results certificates for the
duration of the monitoring periods
• Statutory Declaration made by Dr Darren Drapper confirming role
in monitoring data, maintaining field equipment, co-ordinating
sample collection, identifying qualifying events and calibration of
monitoring equipment
© Stormwater Australia 2021 1
Page 15
Verification Certificate – SQIDEP VC
Reference Number: SA-2021/006/VC
Technology Information
Applicant’s Total Suspended Solids (TSS) 88 %
Verified Total Phosphorus (TP) 69 %
Performance Total Nitrogen (TN) 67 %
Claims Total Petroleum Hydrocarbons 0%
Maintenance Maintenance procedures undertaken during the monitoring period included
performed cleaning of the sedimentation chamber once every 12 months. The filter bag
during was also checked once every 12 months but was not replaced.
monitoring
Verified • The submitted, calibrated MUSIC model provides a method of modelling the
method to technology with 1 Generic node as per the image below, with a bypass
model in flowrate equivalent to 0.5L/s/lin.m of Hydrochannel;
MUSIC
• The input criteria for the node is;
o Generic node
High Flow Bypass 0.5 L/s/lin.m
Total Suspended Solids Input = 1000 mg/L Output = 120 mg/L
Total Phosphorus Input = 5 mg/L Output = 1.55 mg/L
Total Nitrogen Input = 50 mg/L Output = 16.5 mg/L
Conditions The limitations of the acceptance of these claims include:
• The results are for a road based catchment. The results lie within acceptable
inflow limits for this type of catchment and based on the analysis are found to
be acceptable. This does not necessarily relate to other catchment types,
though it is noted that hard stand catchments will behave similarly. Cleaner,
roof catchments may not achieve the same pollutant reduction targets.
• The results are for a hydraulic loading rate up to 0.5 L/s per metre module.
Should the hydraulic load rate exceed this, the results would be expected to
decline in line with excessive loading on the device.
• The results are reliant on the maintenance of the device being consistent with
the manufacturers guidelines and those that are contained in the report.
© Stormwater Australia 2021 2
Page 16
Verification Certificate – SQIDEP VC
Reference Number: SA-2021/006/VC
• The Hydrochannel media is estimated to have an effective life of 1 year. It is
suggested that a 12 month maintenance cycle include replacement of the
media.
• Performance is contingent upon the installation being similar to that shown in
this trial. Alternative installations may result in different outcomes.
Independent Mr Andrew Allan, Afflux Consulting
Reviewers
Mr Damian McCann, Australian Wetlands Consulting
Accepted by
17th June 2021
Governance Panel
Accepted by
22nd June 2021
Stormwater Australia
Board
© Stormwater Australia 2021 3
Page 17
Stormwater Quality Improvement Device Evaluation Protocol (SQIDEP)
VERIFICATION CERTIFICATE
Applicant Information
Applicant Name Atlan Stormwater
Applicant Address 130 Sandstone Place, Parkinson, QLD 4115
Website www.atlan.com.au
Contact Email [email protected]
Verified Technology
Product Title Atlan Stormsack
SQIDEP Pathway Field Evaluation via reviewed QAPP
Reviewed The following documents form the basis of this independent evaluation:
Documents 1. Stormsack detailed performance report (Stormsack DPR) (Issue 2)
Drapper, D., Waldron, S., & Nyakas, L. (2024). SQIDEP Detailed Performance Report –
Stormsack (Issue 2), Drapper Environmental Consultants, Crestmead, Queensland,
Australia
2. Hydraulic Performance (Treatable Flowrate) Lab Testing report (Issue 1), 5 July 2024
Drapper, D., Nyakas, L. (2024). Hydraulic Performance (Treatable Flowrate) Lab Testing
report (Issue 1), Drapper Environmental Consultants, Crestmead, Queensland,
Australia
3. ATLAN Stormsack Device Lab Testing Report (Issue 3), 5 July 2024
Drapper, D.; Nyakas, L. ATLAN Stormsack Device Lab Testing Report (Issue 3); Drapper
Environmental Consultants: Crestmead, Queensland, Australia, 2024.
4. StormSack Performance Assessment, Report Number: MHL2325, Manly Hydraulics
Laboratory, November 2014.
Page 18
Technology Information
Applicant’s
Verified Parameter
Performance Total suspended solids 45%
Claims (ER) Total phosphorus 47%
Total nitrogen 25%
Total petroleum Not claimed
hydrocarbons
Gross pollutants 100 %
IEP’s comments: Nil.
IEP’s recommendations: All performance claims are considered compliant up to the
treatment flow rate for the applicable device. Verified flow rates are included in the table
below:
Size of Stormsack (Pit TFR for MUSIC modelling – high
dimensions) (mm) flow bypass in litres per second
450 x 450 10
600 x 600 25
600 x 900 32
900 x 900 39
1200 x 900 50
1200 x 1200 65
Test Stormwater 21 compliant stormwater events. Water chemistry was compliant with Table 1 in
Runoff SQIDEP v1.3. Minimum number of aliquots collected, and samples were
representative.
Test Catchment - The field testing for the ATLAN Stormsack (200) was carried out at Griffith University,
Carpark H, Parkland Campus, Griffith Way, Southport, QLD, 4215.
- The catchment area draining to the device was reported to be 1,181 m2 directly connected
to the Stormsack. The catchment was reported to be 66% impervious with the remainder
including a eucalyptus forested area which drains to the Stormsack.
Maintenance The Stormsack should be cleaned/maintained when accumulated pollutants reach
Performed during the trigger level of 150mm depth in the bag, or 50% capacity by volume.
monitoring
The monitored Stormsack was maintained twice during the SQIDEP monitoring
program due to construction loads received from earthworks undertaken in the
upstream catchment. Regular inspection of the Stormsack is recommended, as per
the manufacturer’s O&M manual.
Page 19
Verified method:
The Reviewers have verified that the method undertaken complies with the intent and specifics of
SQIDEP v1.3.
A more detailed Independent Evaluatores Report is available to get an understanding of what was
checked and how the claim was verified.
Conditions/Notes
MUSIC modelling shall be carried out as follows:
A generic node is to be used in MUSIC with a high flow bypass set to the applicable TFR (see
table below) for the size of the Atlan Stormsack proposed and with inlet and outlet
concentrations as follows:
Pollutant Inlet concentration Outlet Concentration
TSS 100 55
TP 100 53
TN 10 7.5
Size of Stormsack (Pit dimensions) TFR for MUSIC modelling – high flow
(mm) bypass in litres per second
450 x 450 10
600 x 600 25
600 x 900 32
900 x 900 39
1200 x 900 50
1200 x 1200 65
Page 20
Independent Reviewers
Evaluator Name Evaluator Signature
Mark Liebman
Baden Myers
Issue of Verification Certificate
Acceptance by SQIDEP Governance Panel
Acceptance by Stormwater Australia Board of Directors
Verification Issued
Stormwater Australia Verification Certificate Number Reference SA-2024/12-VC
Verified under SQIDEP Version 1.3
Body of Evidence Pathway
Page 21
6 5 4 3 2 1
1000
640
20 150 150 150 150
D D
20
150
150
A A
1000
640
150
45°
150
C ISOMETRIC VIEW C
PLAN VIEW
1000
180 640 180
C:\Users\smart\OneDrive\Documents\Vault\Designs\ATLAN\01 - STANDARDS\STORMSACK\STS.7575.C1\STS.7575.C1.idw
95 95 95 95 95 95
48
100
52
100
50
103 103
750
ISOMETRIC VIEW
835 EXPLOSION
B B
500
660
SECTION A-A
400
750
o 835
ELEVATION VIEW
TOLERANCE: All Dimensions to Closest 10 mm & +/- 30 mm ALL INTERCONNECTING PIPEWORK, PITS AND ASSOCIATED DRAINAGE BY OTHERS
CLIENT: The drawings must not be disclosed to any third
Drawn Date PROJECT :
parties without written permission from ATLAN STORMWATER .
Unauthorized disclosure may result in prosecution. R.J. 17/04/2024
© ATLAN STORMWATER - This drawing is the property of ATLAN
STORMWATER ABN: 83 151 832 629 and is subject to return on Check Date TITLE
A demand.It is submitted for the use only in connection with the ATLAN STORMSACK A
proposal and contracts of ATLAN STORMWATER with the expressed
conditions that it is not to be reproduced or copied in any form. Verified Date STS.7575.C1
This data must only be used in accordance with our standard GENERAL ARRANGEMENT
terms and conditions.
© Copyright Approved Date
ATLAN STORMWATER accepts no responsibility for any loss or
damage resulting from any person acting on this information. SCALE SIZE SHEET REV
The details and dimensions contained in this document may change, A3 1 1
N.T.S
R.J. please check with ATLAN STORMWATER for confirmation of current Request No.
1 17/04/2024 INITIAL RELEASE CUSTOMER CODE : DWG No.
specifications.
REV DATE BY DESCRIPTION CHK STS.7575.C1
6 5 4 3 2 1