20230025_RECOR_MCU Engineers Letter_20.12.24
site will be required to achieve the following design objectives for operational stormwater
quality.
Table 1 - Operational Water Quality Objectives
Pollutant Percentage Reduction Target (%)
Total Suspended Solids (kg/yr) 80
Total Phosphorus (kg/yr) 60
Total Nitrogen (kg/yr) 45
Gross Pollutants (kg/yr) 90
Water Quality Modelling
Details of the proposed treatment train are provided in RECOR’S SWMP. Further details of
the proposed devices and preliminary sizing are provided below. Locations of the
proposed devices are shown on the revised civil drawings.
Bioretention Basin
Table B in Appendix 2 of the State Planning Policy (2017) states that “In lieu of modelling,
the default bio-retention treatment area to comply with load reduction targets for all
Queensland regions is 1.5 per cent of the contributing catchment area”. MUSIC modelling
has not been undertaken for sizing of the proposed bioretention basin. The proposed
bioretention basin has been sized at 1.5% of the contributing catchment area in lieu of
MUSIC modelling.
It is proposed to provide a bioretention basin design for this project generally in
accordance with the following typical section.
Figure 1 -Typical Cross Section of a Bioretention Basin
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.