53. The applicant shall provide a fire service (fully testable single detector check with metered
bypass), where applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire
hose reels).
54. Any construction works to be undertaken in the vicinity of Council’s existing water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of existing infrastructure must be met by the
applicant.
Service Easements (Sewer / Stormwater)
55. No building or other structure shall be constructed or encroach over an easement.
Construction Issues
56. A Traffic Management Plan for the each construction phase of the development shall be
submitted to and approved by Council at least 5 working days prior to the commencement of
any Building works or at least 5 working days prior to the pre-start meeting for Operational
Works. The Traffic Management Plan shall include but not be limited to:
Limiting the routes for the heavy vehicles to the major road network and prohibit the
use of the local roads as access to the site;
Indicate provision for on-site and off-site parking for the required workforce;
Indicate the location of loading and unloading areas,
Indicate the location of any “holding” areas for heavy vehicles and
Operating hours.
57. Construction staff shall not park on Serenity Close or elsewhere on-street. Parking shall either
be on site, an adjacent vacant site or at a suitable off-site location serviced via a shuttle bus.
58. A Condition Survey must be carried out on existing structures and services prior to any
excavation or construction works taking place on site. If distress already exists, a
photographic survey should be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented.
Earthworks
59. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands and/or services within the development site or that
border the development site. Fences that are affected shall be replaced prior to the Building
Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall
be clearly shown on the plans submitted for Operational Works approval.
60. Plans and details outlining the extent of earthworks required on site and any trees to be
retained shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
61. All major excavations (including the basement and driveways) shall be shored to prevent
batters extending into areas and vegetation that are to be retained. All trees to be retained
should be adequately tagged to Council’s satisfaction and enclosed with a barrier fence to the
drip line to prevent damage.
62. A geotechnical engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land and/or services, and make
recommendations on the type of foundation system(s) best suited for the proposed
development. The recommendations of this report shall be incorporated into the design and
construction of the proposed development.
Page 8 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 579 KB (small file)
- File type
No other editions are linked here.