Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.1.6 MODEL VERIFICATION CHECK - RATIONAL METHOD
A verification check of the XP-RAFTS model was undertaken by comparing model generated peak flows with Rational
Method calculations. A Rational Method calculation was undertaken for the overall catchment to Discharge Location B.
Refer to Appendix B for Rational Method details. A comparison is provided in Table 3-4 below.
Table 3-4: Existing Peak Flow Comparison at Discharge Location B
Rational Method XP-RAFTS Peak Difference
AEP
Peak Flow (m3/s) Flow (m3/s) (%)
63% 1.32 1.14 -14%
39% 1.80 1.71 -5%
18% 2.55 2.54 0%
10% 2.96 3.02 2%
5% 3.69 3.69 0%
2% 4.82 4.28 -11%
1% 5.27 4.95 -6%
As indicated in the table above, XP-RAFTS peak flows vary from QRM, but are generally lower than the QRM peak flows.
The average variance is 5%. Therefore the model parameters adopted from the council report in Section 3.1.2 are
considered appropriate.
3.2 DEVELOPED MITIGATED SCENARIO
The Developed Mitigated Scenario was undertaken to demonstrate no adverse impact as a result of the proposed
mitigation measures.
3.2.1 CATCHMENT CHARACTERISTICS
Developed catchments were delineated and split based on preliminary earthworks. A Fraction Impervious value of 70%
was adopted for all sub-catchment areas as per the Concept SWMP Report (No. B14158.W-03A dated November 2015).
Catchment details have been updated to reflect minor changes undertaken during detailed design. The vectored slope
remains consistent with the corresponding existing catchment, as no significant changes under developed conditions
were expected. A summary of the developed catchment details are provided in Table 3.5 below.
Table 3-5: Developed Mitigated Scenario Catchment Details
Downstream Sub-
Overall Sub- Fraction
Sub- Catchment Vectored Slope (%)
Catchment catchment Impervious
Catchment Area (ha)
North A1 A2 0.98 0.70 0.7%
A2 A_OUTLET 1.51 0.70 2.9%
Central B1 B2 2.13 0.15 1.7%
B2 B3 2.38 0.70 2.5%
B3 B4 2.06 0.70 7.1%
B4 D 1.05 0.38 4.0%
South C1 C2 1.32 0.22 0.8%
C2 C2 2.02 0.80 2.6%
C3 D 2.93 0.70 6.0%
Central & D1 D2 0.27 0.63 4.4%
South D2 D_OUTLET 1.25 0.70 4.0%
D3 D_OUTLET 0.58 0.70 4.0%
16-001014-01B | STORMWATER MANAGEMENT PLAN COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS ROAD, COOROY |9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.