Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Since the Issue A report results in Table 3-11 were updated to incorporate modified storage and discharge of the
Central Basin. Results indicate that the basin WSL’s are still below the top of the embankment levels.
As indicated in the above table, basin WSL’s indicated above are below top of the embankment levels.
3.2.8 INTERNAL DRAINAGE STRATEGY
An internal stormwater drainage strategy is required to ensure that runoff is managed effectively through the site during
minor and major storm events. The following is proposed:
• Management of Internal Site Runoff -The proposed site stormwater network and road system is proposed to
convey the major and minor storm events through the site. Typically, road drainage is designed to convey the
minor storm only as per Council’s requirements. However, drainage has been upsized due to the limited
overland flow or road capacity. This will decrease the frequency of runoff conveyed over the road, which
promotes safety. As a minimum the minor drainage design capacity will be the 10% AEP storm event with road
network or overland flowpaths to convey 1% AEP storm event.
• Management of External Catchment Runoff - As indicated in Drawing No. B14158.W-SK101 provided in
Appendix G, stormwater drainage through the site will be upsized to convey major storm runoff from the
external catchments (Sub-Catchment C1 and C2) through the site.
• Drainage Easements – Drainage easements are indicated on Drawing No. B14158.W-SK110 & SK111 provided
in Appendix G.
• Discharge to Existing Swale on Site – Manning’s calculations were undertaken to compare peak flows and
velocities through the existing swale located along the boundary of Lot 4 on RP215922. Results indicate that
flood levels are less in the swale under existing conditions due to the proposed peak flow mitigation measures
(i.e. detention basins). Refer to Appendix E for details. Furthermore scour protection has been designed based
on QUDM (2013) at pipe outlets discharging to the swale to prevent scour and erosion. Refer to the SMCMP
Report (No. 16-001014-02B dated January 2017).
• Basin Scour Protection – Rock scour protection has been designed at each basins inflows and outflows. Energy
dissipater calculations for each basin are provided in Appendix E. To protect from vegetation damage velocity
checks within each basin have also been undertaken with details provided in Appendix E.
16-001014-01B | STORMWATER MANAGEMENT PLAN COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS ROAD, COOROY | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.