Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4         STORMWATER QUALITY
It is expected that the proposed development will increase the export of pollutants in runoff from the subject site. A
treatment train of a suitable Stormwater Quality Improvement Devices (SQID’s) have been proposed to intercept and
capture the pollutants. The methodology adopted in this analysis is generally consistent with the past approvals.
However, the proposed Water Quality Control Pond has conservatively not been modelled. This section discusses:

•    The identification of key stormwater pollutants associated with the proposed development;
•    The Water Quality Objectives (WQO’s) identified for the catchment;
•    The stormwater quality management strategy to mitigate the increase in pollutant export; and
•    The modelling of the proposed measures and comparison to the identified WQOs.

4.1       POLLUTANTS OF CONCERN
Typical key pollutants expected to be generated during the operational (post-construction) phase of the planned
development are listed as follows, with those presented in capitals being the key pollutants to be targeted for treatment:

 •    LITTER                                                 •   HEAVY METALS (associated with fine sediments)
 •    SEDIMENT                                               •   Surfactants
 •    Oxygen demanding substances (possibly present)         •   Organochlorines & organophosphates
 •    NUTRIENTS (N & P)                                      •   Thermal pollution
 •    Pathogens / Faecal coliforms                           •   pH altering substances
 •    Hydrocarbons
Only the key pollutants will be further addressed in this report; however, the treatment train developed will adequately
mitigate the other pollutant loads. As heavy metals will predominately be associated with fine sediment, controls
proposed to reduce total suspended solids will also adequately reduce loads of heavy metals.

4.2       WATER QUALITY OBJECTIVES
Healthy Waterways WSUD Technical Guidelines (2006) outlines stormwater pollutant load reduction objectives required
for all developments within South East Queensland. These objectives have been adopted as the WQOs for conceptual
modelling of the development site and are summarised in Table 4-1 below.

                                  Table 4-1:   Load Reduction Water Quality Objectives
                           Total Suspended          Total Phosphorus                                  Gross Pollutants
        Pollutant                                                           Total Nitrogen (TN)
                             Solids (TSS)                  (TP)                                            (GP)
     Load Reduction
                                  80%                      60%                      45%                      90%
         Target

It is noted that the above load-based objectives are consistent with those specified in the SEQ Regional Plan Guideline
No. 7, required under the SPP 2014.

4.3       STORMWATER QUALITY MANAGEMENT STRATEGY
A treatment train of suitable SQIDs has been proposed to mitigate the potential increase of stormwater pollutant loads.
Three SQIDs have been provided for the development to treat stormwater runoff before discharging downstream. The
locations of these devices are shown on Drawing No. B14158.W-SK102 in Appendix G.

As presented in Drawing No. B14158.W-SK102 in Appendix G some minor external catchment runoff flows through the
site and will be treated by the SQIDs. Treatment of stormwater runoff from external catchment areas of the railway
corridor and Cooroy Connection Road adjacent to the site is not an obligation of the developer. Not treating these



16-001014-01B | STORMWATER MANAGEMENT PLAN                       COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS                                                                   ROAD, COOROY                  | 15
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.