Log in to see the plans as drawnBioretention Basin ‐ Energy Dissipater Calculations (Derived From QUDM, 2013)
Pipe Outlets
Sizing of the scour rock protection for pipes was determined using calculations specified in Section
8.7 of QUDM, 2013. Below indicates rock protection requirements and the adopted outlet rock
protection configuration at each pipe outlet.
Northern Bioretention Basin Outflow Central Bioretention Basin
Location
(375) Outflow (375)
Q (m3/s) 0.48 0.23
Area (m2) 0.1 0.1
Outlet Velocity (m/s) 4 2
Pipe Diameter 0.375 0.375
Multiple Cells? NO NO
Multiplication Factor for Multiple Cells N/A N/A
Length Ratio D:L 3 3
Width (m) 1.4 1.4
Length (m) 1.125 1.125
d50 (mm) 200 200
Thickness of Rock Protection (mm) 400 400
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.