Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
CC___
BBQ AREA
DECK
POOL
SPA
SPA
__
CC___
[OCR of page images]
LEGEND:
SITE BOUNDARY
DEVELOPED CATCHMENT BOUNDARY
PROPOSED STORMWATER DRAINAGE
NORTHERN BASIN
PROVIDES PEAK
FLOW MITIGATION
CENTRAL BASIN
PROVIDES PEAK
FLOW MITIGATION
EXISTING SWALE
SOUTHERN BASIN
63% AEP PEAK FLOWS TO
BE DIRECTED TO POND
63% AEP PEAK
FLOW PIPE DIVERSION
DY TRADING POST ROAD.
—
ewo—eL
(3
UPSIZED SITE DRAINAGE NETWORK AND STORMWATER EASEMENT
TO CATER FOR UPSTREAM EXTERNAL CATCHMENT FLOWS
WATER QUALITY CONTROL POND
OR BIORETENTION BASIN >
FLOW DIRECTION
63% AEP PEAK FLOW DIVERSION
SITE DISCHARGE LOCATION
EXISTING SWALE
PROPOSED EASEMENT (STORMWATER/SERVICES)
SITE DRAINAGE AND ROAD NETWORK
DESIGNED TO CONVEY 1% AEP PEAK FLOWS
OF UPSTREAM EXTERNAL CATCHMNET
NOTES:
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
‘ C
* oR FURTHER BASIN CONFIGURATION REFER 1.
TO DETAILS PROVIDED ON SUBSEQUENT
PLANS, SIZING SUBJECT TO DETAILED DESIGN.
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
16-001014-01.
2. SPLIT FLOW PIT TO DIVERT 63% AEP FLOWS FROM
CATCHMENT B2 TO GPT AND BIORETENTION BASIN
MINOR DESIGN STORM CONVEYED
THROUGH SITE DRAINAGE. MAJOR
OVERFLOWS DIRECTED TOWARDS
TRADING POST ROAD
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
a
8
2
=
DATE
AMENDMENT DETAILS. DESIGN CHECK
"SCALE (METRES 7
cd
CH [IW | 29.10.15 | MINOR LAYOUT AMENDMENT
#_| IW [12.015 [MINOR LAYOUT AMENDMENTS ‘250 2 : 3
OzmzozmE>
= eo[@]>
=
50 Al
05.02.16
LAYOUT AMENDMENTS:
4.2500
DRAWN CHECK
26.08.16
MINOR” AMENDMENTS
200
UPDATED CENTRAL BASIN
a3
MIGROFICM No,
PROJECT No.
B14158.W
SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
Ph (07) 5443 2844 Fax (07) 5443 7146
APPROVED ANDREW McPHAIL RPEQ 6921
MATTHEW HLL RPEQ 11578
FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTO
“CLIENT
PALM LAKES RESORT
Cc
PROECT
callore
CONSULTING
PALM LAKES - COOROY
RETIREMENT COMMUNITY
Callbre Consulting (QLD} Pty Lid
Queen
(CONSULT AUSTRALIA
ental
i> Amin Extored
‘Ground Fer, S Bidens
Telephone 07 3895 3444 Facsimile 07 3895 2400 isohont
Recere Gabor Hebou tay Bappon Bene Coet 1c 404
‘DRAWING TITLE
DEVELOPED MITIGATED
CATCHMENT PLAN
‘DRAWING NUMBER
B14158.W-SK101
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.