Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            POOL




SPA
      SPA
                          -



                   DECK


[OCR of page images]
 

LEGEND:

Sw0-

—— =| oS =

WLM
ELLA

FILE, BUS1S8.W-SK102.duq DATE: 12-11-2015 TIME: 1531
Pref’s: X_BIs158.W_TITLE X_BI61S8.W_BASE USR: chris mok

NORTHERN BASIN (SW QUALITY & DETENTION)
BIORETENTION SYSTEM WITH SEDIMENT FOREBAY
FILTER AREA: 525m?

FILTER DEPTH: 0.4m

TEMP. PONDING DEPTH: 0.3m

CENTRAL BASIN (SW QUALITY & DETENTION)
TREATMENT TRAIN INCLUDES WaQcP,
BIORETENTION BASIN AND UPSTREAM GPT
REFER TO STAGE 2 OPERATIONAL WORKS
DRAWINGS FOR DETAILS

At WA

SITE BOUNDARY

MUISIC CATCHMENT BOUNDARY

PROPOSED STORMWATER DRAINAGE

PROPOSED FLOW PATH

WATER QUALITY CONTROL POND
OR BIORETENTION BASIN *

MODELLED AS COMMERCIAL

   

WOODWORKING/GOLF ROOM
AND TENNIS COURTS

STORMWATER DRAINAGE EASEMENT
AND SERVICES CORRIDOR

BIOPOD D2
BIORETENTION SYSTEM WITH
UPSTREAM GPT

FILTER AREA: 75m?

FILTER DEPTH: 0.4m

TEMP. PONDING DEPTH: 0.2m

CARETAKER’S

‘sy:

(e

|_| BOWLING | |
GREENS

 

 

 

 

 

 

 

SWIMMING
POOL

 

us

1— SWD-

ri)

a

 

 

BIOPOD D3

FUTURE DEVELOPMENT TO HAVE OWN
STORMWATER QUALITY TREATMENT
CONTROLS

FILTER AREA: 75m?

FILTER DEPTH; 0.4m

TEMP. PONDING DEPTH: 0.2m

SOUTHERN BASIN

BIORETENTION SYSTEM WITH UPSTREAM GPT (TREATED
FLOWS TO DISCHARGE INTO CENTRAL WQCP)

FILTER AREA: 305m?

FILTER DEPTH: 0.4m

TEMP. PONDING DEPTH: 0.3m

REFER TO STAGE 2 OPERATIONAL WORKS DRAWINGS
FOR FURTHERDETAILS

SPLIT FLOW PIT (63% AEP PEAK

TRADING POST ROAD

 

 

 

FLOWS TO SOUTHERN BASIN)
\

 

 

 

 

 

 

 

 

 

 

—

 

 

2
|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

MUSIC CATCHMENT LABELS

LOW FLOW DIRECTION

MODELLED AS AREAS
BYPASSING TREATMENT

 

 

* or FURTHER BASIN CONFIGURATION REFER
TO DETAILS PROVIDED ON SUBSEQUENT
PLANS, SIZING SUBJECT TO DETAILED DESIGN.

 

 

COOROY CONNECTION ROAD

MUSIC CATCHMENT PLAN
SCALE 1:1250 (A1)
SCALE 1:2500 (A3)

 

 

NOTES:

MINOR DESIGN STORM CONVEYED
THROUGH SITE DRAINAGE. MAJOR
OVERFLOWS DIRECTED TOWARDS
TRADING POST ROAD

SITE DEVELOPMENT TO ACHIEVE 90/60/45
LOAD REDUCTION OBJECTIVES. STORMWATER
QUALITY TREATMENT DEVICES MAY CONSIST
OF BIORETENTION SYSTEMS WITH TOTAL
FILTER AREA OF 500m? OR OTHER INTEGRATED
SOLUTIONS (e.g. MULTIPLE BIORETENTION

\ PODS, PROPRIETARY DEVICES, COMBINATION OF
DEVICES, etc.) TO MEET THESE OBJECTIVES.

   

| CENTRAL 3 b
SBIORETENTION 9 5 a

BASIN x

FILTER AREA 2

= 650m? s
2; 5 5 c g 120 BED AGE %
kal CARE FACILITY ®)
Ba)

— * swo——— | :

1. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH CALIBRE CONSULTING REPORT No.

16-001014-01.

2. SPLIT FLOW PIT TO DIVERT 63% AEP! FLOWS
FROM CATCHMENT B2 TO GPT AND

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

BIORETENTION BASIN.

 

FRET [CALCS [DRAWN] _OATE
vesue PP | iat

 

AMENDMENT DETAILS.

DESIGN CHECK

 

B_[ aw [05.02.16 [LAYOUT AND CATCHMENT AMENDMENT

 

‘=>

H_[- cr _[ 0009.16 [MINOR AMENDMENTS:

1250 25 0

"SCALE (METRES 7

MIGROFICM No,
SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE

50 Al Ph (07) 5443 2844 Fax (07) 5443 7146

 

 

4.2500
DRAWN CHECK

 

H_[ or [23.2.16 [AMENDMENTS TO LABELS

 

A
B
[ome [mp | 19.12.16 [ upDATED MUSIC MODELLING
D
E
F

Oszmzozm!

H_[ RH _[ 20.0117 J UPDATED CENTRAL BASIN

 

 

 

 

 

 

 

 

 

AB PROJECT No.

B14158.W

"APPROVED.

 

 

FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTO

ANDREW McPHAIL RPEQ 6921
MATTHEW HILL RPEQ 11578

“CLIENT

‘DRAWING TITLE

PALM LAKES RESORT

 

 

PROECT

PALM LAKES - COOROY
RETIREMENT COMMUNITY

 

callore

CONSULTING

Callbre Consulting (QLD} Pty Lid

Level 6, 199 Gray Steet, South Brisbane QLD Austria 4101
‘Telephone 07 3895 3444 Facsimile 07 3895 2400
Racerw Garton Mateus tty Bane Danae Cet

1 a

MUSIC CATCHMENT
PLAN

 

 

‘DRAWING NUMBER TSSUE

B14158.W-SK102 E

 

 

 
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.