Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn PO
OL
SP
A
-
DECK
[OCR of page images]
Y | \
[A L \ | \
PROPOSED 6m WID! 4ly \ | N
DRAINAGE EASEMENT ‘4//¢ \ | \
4 |
7 )
/ \ oe J
PLUNGE POOL / y NY,
ENERGY 4/7 / \ LEGEND:
DISSIPATER 4% / \ a
\ a \ SITE BOUNDARY
EXISTING SWALE a \ sw PROPOSED STORMWATER DRAINAGE
BIOPOD D2 ) Cau PROPOSED STORMWATER EASEMENT
a \
oN a a RETAINING WALLS
FLOW DIRECTION
NORTHERN BASIN
63% AEP PEAK FLOW DIVERSION
“ \ a
7 7 \ = DISCHARGE LOCATION
L \ L
- \ \ “
fA A \ \ a EXISTING SWALE
L . \
LZ \
7 \ \
CONCEPT ROAD AND DRAINAGE a~\ \
LAYOUT SHOWN IS SUBJECT TO a \ \
FUTURE STAGE 4 OPERATIONAL Z \ \ a \ \
WORKS DESIGN AND APPROVAL a \ - L \
“ \ | \ - LS \ \
\
825 ; \ “ ,
a \ a a \ \
“ - a —
a - <
Co \ ‘ \
PROPOSED GPT ) \ \ a
UPSTREAM OF BASIN [ \ \
< [ “ “ \ \ —
a “ a
a \U
a \ \
\ py ~
tn a \ —
| PEAK FLOWS ABOVE THE 1 YEAR a \ —
|/— PROPOSED SWIMMING POOL ARI STORM TO BE DIRECTED =a \
REFER TO ARCHITECTURAL FOR TOWARDS SWALE
LANDSCAPING AND FENCING r— 5m WIDE % \ \
m 5
STORMWATER $2 \ \
EASEMENT 417 ~\ \
3m WIDE DRAINAGE
__ EASEMENT
63% AEP PEAK FLOW
DIVERSION © 900
PROPOSED GPT
UPSTREAM OF
BASIN
SPLITTER MANHOLE TO DIRECT 63% AEP
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
TNS
PROPOSED STORMWATER DRAINAGE
( y . THE PROPOSED SWALE & DRAINAGE EASEMENT — Proe ) lca Tt A
NS SONY a Q (10% AEP) TOWARDS SOUTHERN BASIN.
’ “ . is ”
Vie a PR + SPLITTER MANHOLE TO DIRECT 63% verre TeADING BOSS ROAD
a ? \ | | [i] | ZZ__ AEP PEAK FLOWS TO PROPOSED
— — | | -—___ = ‘¢ =
Li) 63% AEP PEAK , ee
// FLOW DIVERSION T
| | Nisa oT
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
LE, BUAIS8.W-SK1N0.dwg_DATE, 12-11-2015 TIME: 08:49 16-001014-01 CONSTRUCTION PURPOSES
Xref's: X_B14158.W_ BASE X_B14158.W_MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde *
Tear outs ene One ao THRONE Ne Ten DRAWS TE
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES , mas
NNW aE 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT ‘CONSULT AUSTRALIA CONCEPT STORMWATER
. Ph (07) 5443 2844 Fax (07) 5443 7146 DRAINAGE PLAN
Fe | | 07.09.16 [ MINOR ANENOMENTS oa 0 u 2 20 a PRORGT - 4
Biot cx | ev [ zoo. [upoaTeo CENTRAL BASIN Drawn cHecx| PROJECT Wo ‘APPROVED ANDREW McPHAIL RPEO. 6921 Calbre Consulting (QLD) Py Lid SHEET 1 OF 2
zp 814158, W win Se] PALM LAKES - COOROY callore ceegecan tracked oo Se area maa am
sir FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD RETIREMENT COMMUNITY CONSULTING Daten fata town fry nen tant Tb GBt B14158.W-SK110 Cc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.