Original source · versioned page text
Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Pamela Arconado
Senior Engineer - Urban Development
T +61 7 323 15505
E [email protected]
This email should be read in conjunction with Calibre Consulting's Disclaimer
From: Cherie O'Sullivan [mailto:[email protected]]
Sent: Friday, 16 December 2016 9:20 AM
To: Pamela Arconado <[email protected]>
Cc: Monkeith Kadhum <[email protected]>; Andrew McPhail
<[email protected]>
Subject: Hydraulic & Water Quality Conditions for OpWorks (16).docx
Hi Pamela,
As promised, please find attached the proposed conditions to be included in the Operational Works approval we
have been discussing.
Condition 64 says for the external site to be included as the development.
You will see I have a note that I need to check B14158.W‐SK105
I will be back after midday on Monday if you would like to discuss anything further.
Kind Regards
Cherie
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.