INTEGRATED PLANNING ACT 1997
ASSOCIATED WITH RECONE
“ sie ut . na 2A ca
42 \s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
LJ No -Gotoo43 Yes
If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
X No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government.
L] Yes
IPA, schedule 8, part 1, table 4, item 2; IP Regulation, schedule 1, par @. table 5, tem tfc}
Wild Rivers code (Note; the cad does not currently contain applicable provisions for residential, indugtiel or cominercial development inside a designated urban
area)
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA.
me
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotog44 [_] Yes
IPA, schedule @ part 1, table 4, tems 14-1G; IP Regulation, schedule 2. table 2. item 5 (vegetation clearing); IP Regulation, schedule 2, table 2, item 24 (koala
conservation): [P Regulation, schedule 1, part 3, table 4. ilem (vegetation clearing/wild river area}: Vegetation Mana ction 224 {vegetation
clearingéwid river area); Wild Rivars Act 2005. sections 31F and 434
e@ iTAKING OR INTERFERING WITH WATER; WILD RIVER AREA . *
44 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake orspring (other than using a water truck to pump water; and other than under the
Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
&X] No -Gotoass [] Yes - Answer (a) and (b) below
eheadule 1. pant 3, tal Baril IA: We
45
|s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
X No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3/b); 1 Regulation. schedule 2, table 2, tein 8; IP Regutatior hedule 1, p
Witd Rivers code (Note: the code dees not currently contain applicable provisions for taking or ink ng with ¢
le 4, item 3
")
46 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
XJ No -Gotoas7 [[] Yes - Answer (a) and (b) below
@ fi is ij Ia 2, tahilo 3 tabi fon QEGA (wikd river
Wild
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BJ No -Gotoozs [7] Yes . -
~ IPA! schedule &. part 1, i fii} IP Regulation, schedule 2 tio
Water 000. section 966A {wild river area}(Nofe: no current Wild Bi
Wild River code (Nate: the cae dogs not currently contain applicable pr
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck fo pump water)?
EX] No -Gotoo49 [-] Yes - Answer both (a) and (b) below
Ip H HAG ie 2 lable 2 Sin GA, Water Act 200), cee
FIVEE te
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No O Yes
(li) To increase the storage capacity of a referable dam by more than 10% No CO) Yes
if yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW), If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4: IP Reguiation, schedule 2, table 2, item 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0425 - Op Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.