Council archive · source document
08/0425 - Op Works - Landscaping [As Published] · 142008.425
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
TIDAL WORK; WILD RIVER-ARE
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoa411 [[] Yes - Answer (a) and (b) below
rs schedule 8, part 1, table 4. item 5; iP Regulation. schedule 2. table 2. items 12. 14 and 17; IP Regulation. schedule 1, part 3, lable 4, lems 4A and $
Coastal Protection and Management Act 1995, section 184A (wild river area}
‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA,
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[DX] No -Gotooa12 [] Yes
IPA, schedule 8, part 1, table 4. iteni 5; iP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation,
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river areal: Wild Rivers Act 2005.
WATERWAY BARRIER WORKS: WILD RIVER AREA”
hedule 7, oart 3, table 4, tems 4A and &
ction 43a
412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
KX) No -Gotoas13 [] Yes
IPA, schedulo & part t, lable
Regulation, s: ¢
2. 1P
4.13 Is any of the operational w work proposed t to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
BX] No - Goto 04.14
(1 Yes
IPA, schedule #. part 1, table 4. item 7: IPA
Hegulation, soheduls 1, pari 3, labie 4. ite
edule 8. part 2, talile 4. i
Pivers Act 2005. sealions
fi 1995s
cole}, IP Reguistion, schedule & lable 2, iteni 25; 1
|REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER:AREA * 8c
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
DX] No -Gotoas15 [7] Yes
IPA, schedtel 4. table 4. item & PPA
Reguialion, st
Paguiation 1995 st 130 £
xn teaj: Wid Rivers Act
WILD RIVER AREA i)...
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoa416 [[] Yes
IPA, schedule 8 part 1, table 4. item 10; iP Regulation. schedule 2, table 2, item 37; Wild Rivers Acl 2065, sectiv
3A
ISTATE-CONTROLLED ROAD
4.16 \s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
IX] No -Endofsection¢ [—] Yes
iP Regulation. schedule 2. table 2, item 2 - ~
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0425 - Op Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.