Council archive · source document
08/0425 - Op Works - Landscaping [As Published] · 142008.425
ADJOINING RETAIL DEVELOPMENT Landscape Specification Proposed & Lot Reconfiguration, Eenie Creek Road, Noosaville From the office of Landgraphics Landscape Architects - Maroochydore for S&L Developments: EXTENT OF WORKS Contractor should take full account of documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. Landscape works are to include the following: - Excavation and drainage to planting areas = Topsoil supply and installation - Edging to street tree planting as required | - Shaping of garden beds = Containerised plant material - supply and installation = Garden mulch - Supply and installation EXCAVATION AND DRAINAGE Break up and remove any excess concrete slurry from construction works to achieve required planting depths. Excavate site soll to a depth of 100mm. Break up remaining subgrade to @ depth of 100mm. Drainage is to be incorporated to ail planting areas that are enclosed by hard edging and not otherwise drained. TOPSOIL - SUPPLY AND INCORPORATION Planting areas are to be progressively filed with premium grade blended organic garden soil mix to a minimum of 100mm depth. Soil to be an approved organic soil mix. Soil supplier, as well as intended mix is to be nominated. Soil is to be mounded to facilitate good drainage to hardstand areas (max 1:3 grade) and is to finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter is to be incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote’ or equivalent is also to be incorporated with individual plantings in accordance with the manufacturers recommendations. To improve the water holding capacity of the dry & well drained soils on site, the adding of a moisture holding product such as “Hydrocell” or “Rainsaver" is recommended following manufacturers guidelines EDGING TO STREET TREE / PLANTING AREAS. Edging to perimeter planting and abutting turf areas, to be extruded concrete edging. Line of edging to be set ‘out and approved on site prior to construction. Refer LAQ2 - LAOS for locations. 5 | ot Reconfiguration E-enie Creek Road, Noosaville LANDSCAPE OPERATIONAL WORKS atc WORKS (084 ENVIRONMENTAL DRAINAGE ean se penieaaeeaantnd P2593 LOTS SHAPING OF GARDEN AREAS Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to ‘show planting to best advantage. Contractor is to seek confirmation of finished levels prior to final plantings ‘and application of mulch. CONTAINERISED PLANT MATERIAL Plant material is to be approved by prior to planting. Planting is to be carried out in a manner consistent with good horticultural practice, All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smaller plant stock is to be staked #8 necessary. Stakes shall not pass through the rootball of plant at time of planting or any time thereafter. Stock may be rejected if plants are:- '8) Undersized proportional to specified container size or is the root system if underdeveloped b) Oversized proportional to specified container size or severely root bound. ¢) Unbalanced or uncharacteristic of normal or specified growth pattem for the species. 4d) Not suitably acclimatised for the specific environment ¢) Diseased, infested with pests or suffering from other form of significant stress. GARDEN MULCH Organic Mulch: Muich shall be weed free clean forest mulch or 2” inch hoop pine bark product to predominant depth of 100mm. Mulch is to be graded to avoid placement against green plant stems and overflow from purpose formed edges, kerbs and pathways. TURF - SUPPLY AND LAY 1a) "A" grade couch minimum sod depth 25mm b) Turf to be laid within 24 hours of being cut ) Allow for ground preparation and deposition of 50mm imported garden loam topsoil with water saving product added. Refer point - 2 Topsoil. Organic fertiliser such as “dynamic lifter” to be spread beneath turf at manufacturers recommended rate ) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface ‘¢) Water in well and monitor for stress. CONCRETE - SUPPLY AND INSTALLATION To pedestrian pavement as shown on drawings, supply and install 125mm depth 25mPa coloured concrete Installation to follow industry best practices including ground preparation, compaction, minimal slump allowances and minimum joint distances. Refer LAOS for details. MAINTENANCE ‘@) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels are critical during early establishment b) Mow turf every 2 weeks c) Prune and shape all shrubs and trees as required ) Remove all stake s at 90 day inspection €) Fertilise ail garden beds at 3 months ) Contractor shall maintain an up to date written log book to record inspection observations and actions * Planting Establishment and Maintenance in accordance with Noosa Planning Scheme Policy 3 - Landscaping Plants & Guidelines (February 2006) FURTHER INFORMATION Please refer to all documentation by James Warren & Assoc Pty Ltd Environmental Consuttants for further information relating to the existing and proposed environmental measures for this development LANDGR a “a APHICS LANDSCAPE ARCHITECTS oot nee tae ite eda el emroae “ecneon | Pm oh sae COT pte = pat Se oo nay enn SS me SLOT RECONFIGURATION S & L Developments 7 ope Manages Ken Hicks & Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0425 - Op Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.