Martoo Response to NC IR
Page 2 Item ‘2a’: Provide a preliminary stormwater design for the proposed development. The design and section must be prepared by a suitably qualified person (Registered Professional Engineer of Queensland) and be in accordance with the recommendations of the site specific geotechnical report Applicant’s Response to Item ‘2a’: Please refer to Attachment C which includes a Stormwater Management Plan for the site. Item 3: Amended plans which remove the raised walkway and associated structures. Applicant’s Response to Item 3: Please refer to Attachment D which provides amended architectural plans that detail removal of the raised walkway. Item 4: Amended plans demonstrating a maximum site cover of 40% for the ground floor. Applicant’s Response to Item 4: The project architect has advised that the revised floor plans comply with site cover requirements and exclude eaves and the pool as it is less than 1m above the ground. The applicant considers that they have now responded to Council’s information request and withdraw the Notice stopping the information request period. The Decision Making Period has therefore commenced and we request that your Council proceeds with its assessment of the application as soon as possible in accordance with the Planning Act 2016. Please contact our Sunshine Coast office if you require any further information and/or clarification. Yours faithfully, Nadine Gorton Senior Planner martoo consulting pty. ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original