Skip to the record
Beware of cheap imitations.

Original source · versioned page text

RFI - Appendix G SWMP by MPN Consulting

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 16 December 2021




                                                    Figure 3 – Treatment Plan

5.3.3.7 MUSIC Results
The resulting percentage based load reductions at the outlet are shown in Table 4 below together
with the Water Quality Objectives for the receiving waters.


                                                                       Residual
                                                      Sources                     % Reduction   Target %
                                                                        Load


 Total Suspended Solids (kg/yr)                         2350             457         80.5         80

 Total Phosporous (kg/yr)                                4.95           1.44         70.8         60

 Total Nitrogen (kg/yr)                                  36.5           17.4         52.2         45

 Gross Pollutants (kg/yr)                                262            2.37         99.1         90
                                 Table 4 – Percentage Based Load Reduction Results




 Excellence with Economy in Engineering                                                                    13
 l:\paige work\8293\16-12-21 stormwater management plan_issue d.docx
Log in to download the original file

RFI - Appendix G SWMP by MPN Consulting.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.