2022-09-06 P&E Agenda - Item 5 - Attachment 1 - Six Mile Creek Bridge Replacement Offset Report - TMR
The original of this document is very large (10.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Figure 1.4 Constructability diagrams indicating how bridge construction will avoid impacts to the existing Six
Mile Creek channel
In summary, the proposed action includes:
New 4 span concrete bridge to be constructed approximately 15 m west (downstream) of the existing
bridge structure
Cast in place concrete piles
No disturbance to the existing Six Mile Creek channel (i.e. construction and piling outside of existing
creek system under normal hydrological flows, as the bridge will span the channel)
Material from the existing timber bridge structure to be utilised by TMR for maintenance of other timber
bridges within the network, with footings within Six Mile Creek remaining in situ to maintain current fish
habitat values
Existing road to be widened in the approach to the new bridge (will not result in additional fragmentation
of surrounding landscape).
The proposed action is planned to be constructed in 2022 and is expected to take between 6 to 9 months to
construct and complete with 4 months working around the creek.
Project number 511784 File Six Mile Creek - Matters of National Environmental Significance Report 2021-12-03 Revision 1 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.