Original source · versioned page text
Meeting papers
Original PDF page 290, section 1. The text section number identifies this passage in the reader.
Performance outcomes Acceptable Outcomes
PO21 AO21.1
Development: For landscape amenity reasons, cut or fill is less than 1.5
(a) has minimal impact on the natural heritage landform of metres in depth relative to the ground level.
the site;
AO21.2
(b) does not lead to erosion or the transport of sediments
Development does not result in sediment or other material
off site; and
including building materials or waste products being deposited
(c) does not lead to the disturbance of natural features, or released into the road reserve, stormwater drain or adjacent
buildings or structures of cultural heritage significance. properties.
AO21.3
Development on a site adjoining a local heritage place
respects the cultural heritage significance of the place by
mitigating any adverse impacts on the setting or integrity of
the heritage values.
Editor’s Note—Local heritage places are identified on the
Heritage and Character Areas Overlay maps in Schedule 2.
PO22 AO22.1
Development on sloping sites: Building and structures are not constructed on land with a
(a) is visually responsive to the natural topography and sits slope greater than 25%.
within the landscape rather than dominating it; and
AO22.2
(b) steps down slopes or uses suspended floor
On sloping sites, splitlevel buildings, with small floorplates,
construction, minimising cut and fill and avoiding
that step down the slope are used as an alternative to slab on
benching of the site.
ground construction to minimise building bulk and benching of
the sites.
Editor's note Refer to Figure 6.9.1A and Figure 6.9.1B
AO22.3
The distance between the ground level and the lowest part of
the floor of the building does not exceed 3 metres.
Table 6.3.3.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
PO23 AO23
Filling and excavation for operational works do not directly, Filling and excavation for operational works is designed and
indirectly or cumulatively cause adverse impacts external to constructed to ensure overland flow and/or flooding is not
the development site by: worsened, impeded, or otherwise diverted to adversely affect
(a) causing ponding of water on the site or nearby land; other properties or downstream environments.
(b) increasing flooding, which adversely affects the safety
or use of any land upstream or downstream; or
(c) adversely affecting the flow of water in any overland flow
path.
Figure 6.3.3.4 Streetscape Character & Building Bulk High Density
Page 290 of 1290
Page 17 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (62f8d7f274.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.