Performance outcomes Acceptable Outcomes
PO24 AO24.1
Development: Cut or fill is less than 1.5 metres in depth relative to the ground
level.
(a) does not impact on landscape amenity;
(b) has minimal impact on the natural landform of the site; AO24.2
(c) does not lead to erosion or the transport of sediments Development does not result in sediment or other material
off site; and including building materials or waste products being deposited
or released into the road reserve, stormwater drain or adjacent
(d) does not lead to the disturbance of natural features, properties.
buildings or structures of cultural heritage significance.
AO24.3
Development on a site adjoining a local heritage place respects
the cultural heritage significance of the place by mitigating any
adverse impacts on the setting or integrity of the heritage values.
Editor’s Note—Local heritage places are identified on the
Heritage and Character Areas Overlay maps in Schedule 2.
PO25 AO25.1
Development on sloping sites: Buildings and structures are not constructed on land with a
(a) is visually responsive to the natural topography and sits slope greater than 25% to protect scenic amenity and other
within the landscape rather than dominating it; and landscape qualities.
(b) steps down slopes or uses suspended floor
AO25.2
construction, minimising cut and fill and avoiding
On sloping sites, splitlevel buildings, with small floorplates, that
benching of the site. step down the slope are used as an alternative to slab on ground
construction to minimise building bulk and benching of the sites.
Editor's note Refer to Figure 6.9.1A and Figure 6.9.1B
AO25.3
The distance between the ground level and the lowest part of
the floor of the building does not exceed 3 metres.
Table 6.3.4.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
PO26 AO26
Filling and excavation for operational works do not directly, Filling and excavation for operational works are designed and
indirectly or cumulatively cause adverse impacts external to constructed to ensure overland flow and/or flooding is not
the development site by: worsened, impeded, or otherwise diverted to adversely affect
(a) causing ponding of water on the site or nearby land; other properties or downstream environments.
(b) increasing flooding, which adversely affects the safety
or use of any land upstream or downstream; or
(c) adversely affecting the flow of water in any overland flow
path.
Figure 6.3.4.4 Hastings Street Character outcome
Page 308 of 1290
Page 17 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (62f8d7f274.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.