Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Meeting papers

of 1290
Performance outcomes                                         Acceptable Outcomes
PO50
Uses are conducted in an environmentally responsible        No acceptable outcome provided
manner, operating without deleterious impacts on immediate,
surrounding or downstream communities, environments or
environmental processes.

Table 6.4.3.3 Criteria for assessment (part)
Performance outcomes                                         Acceptable Outcomes
Infrastructure
PO51
Development is supported by adequate infrastructure and         No acceptable outcome provided
urban services including reticulated water, sewerage,
stormwater drainage, sealed roads, pathways, electricity and
telecommunication infrastructure.
PO52
Development does not adversely impact on the continued          No acceptable outcome provided
operation, viability and maintenance of existing infrastructure
or compromise the future provision of planned infrastructure.




                                                                                                 Page 384 of 1290
                                                                                                        Page 16 of 16

Log in to download the original (62f8d7f274.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.