Original source · versioned page text
Meeting papers
Performance outcomes Acceptable Outcomes
PO41 AO41
Development is supported by adequate infrastructure and Development is connected to reticulated water supply,
urban services including reticulated water, sewerage, sewerage and electricity infrastructure networks.
stormwater drainage, sealed roads, pathways, electricity and
telecommunication infrastructure.
PO42
Development does not adversely impact on the continued No acceptable outcome provided
operation, viability and maintenance of existing infrastructure
or compromise the future provision of planned infrastructure.
Table 6.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
All activities
Car Parking
PO43 AO43
Sufficient car parking is available to accommodate the number Parking is provided in accordance with Table 9.4.1.4 of the
and type of vehicles likely to be generated by the use on site. Driveways and Parking Code
Table 6.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Additional provisions for the Gateway West Makers Precinct
PO44 AO44
Development is for industry and other compatible uses within The gross floor area of an individual tenancy does not exceed
small scale tenancies to encourage opportunities for co 300m2.
location including creative industries and small scale
enterprise.
PO45 No acceptable outcome provided.
Development is consistent with and not negatively impact on
the low impact industrial nature of the area including those
uses listed as Low Impact Industry in Table SC1.1.2
Industry thresholds.
Page 414 of 1290
Page 14 of 26
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (62f8d7f274.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.