Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Meeting papers

of 1290
  Performance outcomes                                           Acceptable Outcomes
  PO40                                                          AO40.1
  Development:                                                  Development does not result in sediment or other material
  (a)   has minimal impact on the natural landform of the site; including building materials or waste products being deposited
                                                                or released into the road reserve, stormwater drain or adjacent
  (b)   does not lead to erosion or the transport of sediments
                                                                properties.
        off site;
  (c)   does not lead to the disturbance of natural features,      AO40.2
        buildings or structures of cultural heritage significance. Development on a site adjoining a local heritage place
                                                                 respects the cultural heritage significance of the place by
                                                                 mitigating any adverse impacts on the setting or integrity of
                                                                 the heritage values.

                                                                 Editor’s Note: Local heritage places are identified on the
                                                                 Heritage and Character Area Overlay Maps in schedule 2.

  PO41
  Uses are conducted in an environmentally responsible        No acceptable outcome provided
  manner, operating without deleterious impacts on immediate,
  surrounding or downstream communities, environments or
  environmental processes.
  PO42                                                        AO42
  Development does not adversely impact on the Lake           Buildings and other structures within the Lake Macdonald
  Macdonald water supply.                                     catchment are located above the 98.5 metres AHD level.

Figure 6.6.1.4 ­ Noosa Junction Key Plan




                                                                                                                   Page 438 of 1290
                                                                                                                          Page 12 of 13

Log in to download the original (62f8d7f274.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.