Figure 36 – Waste management locations




Picture 23 – Waste storage locations
Source: MRA

ISSUE 7: TRAFFIC LAYOUT DETAILS
A full response and additional detail with accompanying cover letter is provided by Cambray
Consulting and included in Appendix F. The following summarises and contextualises the response
to sub-items 23 to 34.
Further traffic layout details are required to assess the proposal.
Information Required
    23. Demonstrate how the one-way operation of the main loading area will be satisfactorily
        managed, including signage where necessary.
Response to sub-item 23:
The one-way operation of the main loading area will be satisfactory managed through the use of
suitable line marking and signage provisions throughout the main loading area. An updated swept
path and servicing assessment have been prepared and included in the revised Traffic Impact
Assessment Report in Appendix F for more details. Signage will be provided to the loading dock
movement. The proposed signages will be provided in accordance with the requirements of MUTCD
and will be resolved during the post approval stage.




 Ltr-20190925-IR Response-Noosa Marketplace_FINAL                                                 58
Log in to download the original file

Ltr-20190925-IR Response-Noosa Marketplace_FINAL (1).pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.