Original source · versioned page text
7. Earthworks Code
Performance outcomes Acceptable Outcomes
Geotechnical considerations Complies
PO3 AO3.1
All filling will be undertaken in accordance with
Earthworks do not result in geotechnical instability Filling works are undertaken in accordance with
Council’s PSP6 – Engineering Design Standards –
on-site or to nearby premises. Council’s Planning Scheme Policy PSP6
Roads and Drainage & Earthworks. All excavation
Engineering design standards - roads, drainage and
will be undertaken with no adverse impact on
earthworks.
neighbouring properties or surrounding
Infrastructure.
AO3.2 Complies
Where the filling is for residential, commercial or Refer above.
industrial purposes the works comply with
Australian Standard - Guidelines for earthworks on
commercial & residential development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.