7. Earthworks Code

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                               Acceptable Outcomes
Local amenity
PO4                                                AO4.1                                                  Complies
Undertaking earthworks does not adversely impact The following control measures are implemented— Regular watering will be undertaken as required
on the amenity of the local area by way of dust,                                                          during the construction phase to minimise any dust
noise or visual amenity.                                    1. regular water spraying of exposed          emissions. An ESC plan has been prepared for the
                                                                areas to suppress dust;                   construction phase as part of the Engineer report
                                                            2. provision of dust stabilised or sealed     and plans. (Refer to Appendix E).
                                                                internal roads;
                                                            3. protective covering of exposed areas       All disturbed areas will be stablished, should they
                                                                that are left for more than 2 weeks;      be exposed for periods exceeding 2 weeks.
                                                                and
                                                            4. unless a development permit provides
                                                                otherwise, disturbed areas are
                                                                revegetated using species identified in
                                                                Council's Planning Scheme
                                                                Policy PSP2 Landscaping.



                                                   AO4.2                                                  Complies
                                                   Earthworks are undertaken only during the hours of Filling and earthworks will only be undertaken
                                                   7:00am to 6:00pm, Monday to Friday and 7:00am to between the hours nominated in AO4.2.
                                                   3:00pm on Saturday. No work is undertaken on
                                                   Sunday or public holidays.
Log in to download the original file

7. Earthworks Code.pdf · 48 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.