Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
upper storey(s), or 40% for all storeys for a building of 2 or more storeys; b) for other classes within the Detached House Zone - 40%; or c) for the Semi-Attached Housing Zone– 40%. O9 For Multiple housing Type 2 No solution provided. Not applicable. buildings have a maximum plot ratio of 0.45:1. O10 For Multiple housing Type 3, No solution provided. Not applicable. Visitor accommodation Type 4 and the accommodation unit component of an Entertainment and dining business Type 3— the maximum gross floor area is equivalent to the maximum allowable population in persons multiplied by 40m2. O11 For the Village Mix Zone, plot ratio No solution provided. Not applicable. does not exceed 1.0:1. Flooding and drainage S12.1 For new buildings or structures The proposal does not involve O12 Buildings and other works are or additions of more than 50m2 gross the establishment of buildings or designed and sited to— floor area to an existing building or structures. a) provide flood free access to premises structure, floor levels for habitable and flood free habitable areas; rooms are— b) allow only minor, short term and a) for areas where minimum floor infrequent flooding of non-habitable levels are available—not less than the areas; specified level; c) ensure carparking areas can be b) for areas where flood modelling is adequately drained; available—a minimum of 500mm above d) ensure drainage does not adversely the modelled flood level; and impact upon other premises; and c) for areas where flood modelling is e) ensure filling or excavation does not not available, a minimum of 500mm adversely impact upon other premises above the highest known flood level; by— AND i. causing ponding of water on the site S12.2 Where Council infrastructure is or nearby land; available— ii. increasing flooding, which adversely a) any drainage (from buildings and affects the safety or use of any land land) flows to that infrastructure; and upstream and downstream; and b) the infrastructure has the capacity
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.