Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Decision Notice - Council Meeting Decision MCU23 0096 [As Published] · MCU23/0096

of 10

Text shows just the words. Original shows the document exactly as it was published.

                        Currency Period
                 2.     This development approval lapses if the use has not happened by 17 October 2030
                        unless an application to extend the currency period is approved by Council.
                        Approved Plans
                 3.     Development authorised by this approval must be undertaken generally in accordance
                        with the Approved Plans listed in the table below.

                           Plan No.            Rev.    Plan/Document Name                         Date

                           SK-02               DA11 College Master Plan prepared by Burling 15.05.2024
                                                    Brown

                           SK-03               DA12 Site Plan prepared by Burling Brown           15.05.2024

                           SK-04               DA12 Ground Floor Plan prepared by Burling 15.05.2024
                                                    Brown

                           SK-05               DA12 Upper Floor Plan prepared by Burling 15.05.2024
                                                    Brown

                           SK-06               DA4     Roof Plan prepared by Burling Brown        15.05.2024

                           SK-07               DA11 Elevations Sheet 1 prepared by Burling 15.05.2024
                                                    Brown

                           SK-08               DA11 Elevations Sheet 2 prepared by Burling 15.05.2024
                                                    Brown

                           SK-09               DA11 Sections prepared by Burling Brown            15.05.2024

                           SK-10               DA8     Long Section prepared by Burling Brown 15.05.2024

                        Nature and Extent of Approved Use
                 4.     The development approval includes 2 stages as detailed on Site Plan SK-03 issue DA11
                        prepared by Burling Brown and dated 15.05.2024:
                           i.   Stage 1 - Construction of performing art centre
                          ii.   Stage 2 - The part demolition of the existing classroom and the construction of Car
                                Park P2 is to be completed within 12 months of the construction of the Performing
                                Arts Centre. Construction of stage 2 - carpark
                        Building Height
                 5.     The maximum height of the development must not exceed 10.64 metres above the
                        ground level and 11 metres from the excavated levels as detailed on the approved plans.
                 6.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld)
                        which certifies that the building does not exceed the maximum height requirement of this
                        Decision Notice.




                                                                                                         Page 2 of 10
Document Set ID: 23317001
Version: 5, Version Date: 24/10/2024

Used in these records

About this file

File size
264 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Council Meeting Decision MCU23 0096 [As Published].pdf · 264 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.