Decision Notice - Council Meeting Decision MCU23 0096 [As Published] · MCU23/0096
3. On or around 31 January each year, an accurate statement of student enrolment
numbers for the forthcoming year must be provided to Council. The statement must be
certified in writing by the school principal.
Carparking
4. A minimum of 298 car parking spaces must be provided on site and made available and
accessible at all times. Car Park P2 is to provide 81 short-term parking spaces, with 16
spaces being available for drop-off and pick-up with queuing for a minimum of 8 spaces.
Vehicle manoeuvring areas are provided on site in accordance with the Australian
Standards for Off-street car parking so vehicles enter and leave the site in a forward
gear.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Advice Energex Limited Town Schedule 10, Part 9, The agency
Planning GPO Box Division 2, Table 2 – provided its
1461 BRISBANE QLD Material Change of Use response on 14
4001 of Premises near a August 2023.
Substation site or subject (Reference No.
to an easement 13800454-
138500463). A
copy of the
response is
attached
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. It is acknowledged that the preliminary Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor employed
to construct the works and a final document will be required to be submitted at the Pre-
Start Meeting for the project.
Private Infrastructure
4. All private infrastructure for the development must be designed to meet the planning
scheme requirements unless otherwise agreed by the relevant authority.
Page 6 of 10
Document Set ID: 23317001
Version: 5, Version Date: 24/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision MCU23 0096 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 264 KB (small file)
- File type
No other editions are linked here.