g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
h. details on the haulage route, type of vehicle to be utilised during construction
activities and frequency of usage. NB any damage to the existing road system as
a result of haulage operations must be fully repaired at the applicant’s expense
Easements
23. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
24. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
25. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
26. All earthworks and associated retaining structure/batters must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Preliminary Approval for an Educational Establishment in accordance with a Master
Plan
PLANNING
Approved Plans
1. Development authorised by this approval must be undertaken generally in accordance
with the Approved Master Plan listed in the table below.
Plan No. Rev. Plan/Document Name Date
SK02 DA11 College Masterplan prepared by Burling 15.05.2024
Brown
Nature and Extent of Approved Use
2. The total number of enrolled students for the educational establishment must not exceed
1150 and the number of equivalent full-time staff must not exceed 150.
Page 5 of 10
Document Set ID: 23317001
Version: 5, Version Date: 24/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision MCU23 0096 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 264 KB (small file)
- File type
No other editions are linked here.