Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
- “RTI-117055 Fotio-B393 [ C aan hoo ra Ls Noveimber 2003 -9- 03632248-001 7.0 GEOTECHNICAL ADVICE 7.1 Earthworks 7.1.1 Site Preparation Prior to any earthworks activities, organic rich topsoil must be stripped and removed from the building areas. This material must not be used as fill to support any structural loads, however it may be used in landscaping areas. Where footings are proposed to penetrate through new fill, it would be prudent to ‘pre-excavate’ shallow colluvium (which contains cobbles and boulders) and replace it with ‘clean’ soil that is free of particles greater than 100 mm. This should enable less difficult excavation for footings following placement of fill. 7.1.2 Excavation The results of the investigation indicate that the proposed excavations should encounter the following subsurface conditions: © Western (dune) side of creek: mostly very loose grading to dense sands, with possibly dense to very dense colluvium (diorite cobbles and boulders with about 30% silty sand) below about 1 m depth adjacent to‘the ereek. The depth of overlying sand increases up slope to in excess of 6 m. e Eastern side of creek: mostlymedium to,dense silty sand and stiff sandy clay colluvium overlying very stiff to\hard inferred residual sandy/silty clay. Numerous high strength diorite ‘core stone’ boulders below about 1.5 m depth. Considering the above, excavation to the depths shown in the design drawings should be achievable using conventional_carthmoving equipment, possibly with the assistance of ‘ripper’ attachments for efficient excavation of the colluvium and to dislodge large boulders. 7.1.3 Filling Fill must not be placed on slopes exceeding 15° or on slopes within about 20 m of the creek (Section 6), unless fully supported by engineer designed retaining structures (ref. Section 7.2). Fill should be compacted at moisture contents within the range of -2% to +1% of optimum moisture content for Standard Compaction. Confirmatory testing must be carried out at regular intervals. A minimum of two tests per 300 mm vertical interval is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing of fill are given in Australian Standard AS 3798-1996 “Guidelines on Earthworks for Commercial and Residential Developments". Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and shall be compacted by Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.