Attachment 5 - Geotechnical Assessment · MCU18/0015
RTI 11/055 Folio B398 Tr i | | 5 November 2003 -14- 03632248-001 Based upon our slope stability assessment in Section 6, piers or deeper pad footings must be designed to resist lateral movement from: e the sandy colluvium (up to about 1.5 m deep) on the eastern side of the creek where ground slopes exceed 15° (includes Cabins 1A, 3A and 3C); and e the very loose to loose sands (up to about 3 m deep) on the western side of the creek below about RL 25 m (includes Cabins 1B, 1C, 2B and 2C). Structures in these areas must also be braced at the surface to resist lateral movement. 7.4 Pavement Design Design parameters for pavements will be dependent upon the subgrade materials present after earthworks and the type, depth and quality of new fill used ¢o bring the site‘to\design levels. The geotechnical laboratory testing from this site, together.with the test pit and borehole results, indicate that the subgrade materials exposed following. earthworks may vary dependent upon the location. CBR values assessed from the results ‘of this investigation, and from previous experience, are provided in Table 6. Table 6; Payement/Design Parameters Design Comments CBR’ (%) 5-15 Value to be adopted will be dependent upon thickness and quality of fill placed. 3 Greater than laboratory result of CBR 1% (see note 2). 5 Considered appropriate based upon experience with similar materials. 10 Less than laboratory test result, however considered suitable based upon our experience with similar materials. Note: 1. Pavement design parameters assume that ‘good’ drainage is installed and maintained. 2. Subgrades with CBR < 3% should be designed as per subgrades with CBR = 3% but with the initial subgrade layer stabilised to a depth of 100-150 mm (eg. cement treated base). Detailed subgrade evaluation should be undertaken during construction following earthworks to confirm design CBR values and the extent of any subgrade stabilisation (if required). This should comprise inspection by Golder Associates. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.