Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
RTI 11/055 Folio B399 November 2003 -15- 03632248-001 7.5 Drainage & Erosion Control In general, site drainage should be designed to readily remove surface water and to prevent ponding of water on subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction is completed. , Erosion can be prevented by minimising vegetation disturbance and by avoiding concentrated high velocity surface water flows by localised grade control and collection of roof runoff in holding tanks. Also, average gradients of finished surface profiles should not be made steeper than the existing surface. To minimise site erosion and maintain stability of slopes after completion of construction, it is recommended that the denuded banks of the creek should be revegetated. The investigation results indicate that groundwater seepage may be encountered‘in areas.along and above the creek banks following periods of heavy or prolonged rainfall. Excess stormwater collected from the site (eg. tank. overflow) should be directed by pipes to an engineer designed dissipation structure(s) located within the creek. As a precautionary measure to prevent instability ofthe creek bank, a subsurface cut-off drain is recommended along the up slope. side of proposed Cabins 1A, 2A and 3A. The cut-off drain should penetrate into the upper intetface of the inferred residual clay underlying the colluvium. It should be noted that this drainvis not required for long-term stability of the proposed structures, whiclwill be supported by footings designed to resist lateral forces, but is a precaution to prevent. slumping and. erosion of the creek bank. Golder Associates should review the design of the drain) 7.6 Construction Management It will be necessary to implement a Construction Management Plan (CMP) for the proposed development. The CMP should include control measures for each component of the proposed construction works to maintain stability of the sand dune in compliance with the recommendations of this report. Golder Associates should prepare relevant parts of the CMP or review the document prior to finalisation. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.