Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= fire, falling timber and any other causes arising from his operations. Any fences damaged during the execution of the work shall be immediately repaired to the satisfaction of the superintendent at the Contractor's expense. 3.2.4 Topsoil Operations Topsoil material stripped from the site, where possible shall be stockpiled for later use in spreading on the playing fields. Nominally 150 mm depth of topsoil is to be removed over the site for reuse. The topsoil shall be respread over the playing fields in preparation for amelioration in accordance with Section 3.4.5. 3.2.5 Tree Protection The Contractor shall protect existing trees, as identified by the Superintendent on site. Harmful Materials Do not store, stockpile, dump or otherwise place under or near trees bulk materials and harmful materials including oil, paint, waste concrete, clearings, boulders, plant and the like. Do not place spoil from excavations against tree trunks even for short periods. Prevent wind-blown materials such as cement from harming trees. Damage Prevent damage to tree bark. Do not attach stays, guys and the like to trees. Work Under Trees Do not remove topsoil from within the drip line of trees unless otherwise specified. If it is necessary to excavate within the drip line, use hand methods such that root systems are preserved intact and undamaged. Open up excavations under tree canopies for as short a period as possible. Roots Do not cut tree roots exceeding 50 mm diameter unless permitted by the Superintendent. Where it is necessary to cut tree roots, ensure all such cuts are clean and even so that the cutting does not unduly disturb or rock the remaining root system. Immediately after cutting, apply an approved bituminous fungicide sealant to the cut surface to prevent the incursion of root rot disease. 3.3 Stripping of Organic Matter In addition to any clearing and grubbing, the whole of the surface upon which any earthworks, roadworks, drainage or services installation is required as well as on allotments shall be stripped of all vegetable and organic matter. All stripped materia! shall be stockpiled on the site, where approved by the Superintendent and replaced on embankment slopes, footpaths and service trenches following completion of earthworks and backfilling. The Contractor shall allow in his tender for stripping 150 mm of topsoil that incorporates organic matter to 41/22382/11840 Girraween Sports Precinct 16 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.