Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

06/1168 - Change a Development Approval [As Published] · 132006.1168.02

of 199

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

=

3. Clearing, Grubbing and Earthworks

3.1 Scope of Works

Work covered in this section of the Specification includes the requirements for clearing and grubbing and
all aspects of earthworks and shall be carried out in accordance with AS 3798 unless specified otherwise
in the following clauses.

All work shall be undertaken in accordance with the Erosion and Sediment Control Plan.
3.2 Clearing and Grubbing

3.2.1 Clearing

The whole area as defined below shall be cleared of all logs, undergrowth, noxious weeds, grass and alt
obstructions and rubbish of every description, trees, undergrowth and grass being cut as close to the
ground as possible.

The area to be cleared shall be the entire area over which roads, drainage works, embankments, playing
fields, excavations and services installations are to be constructed.

No other trees on site are to be removed unless identified.

Trees to be preserved will be identified on site by the Superintendent and these trees shall not be
disturbed in any way during the construction operations.

Trees currently identified to be preserved are shown on drawing C004..

All engineering and RP survey pegs are to be protected from damage during clearing work.

3.2.2 Grubbing

Grubbing shall mean the removal from the ground of all trees, roots, stumps, surface rocks and
obstructions to a depth of 200 mm below natural ground surface. Ungrubbed rocks under embankments.
may be left undisturbed providing there is a depth of at least 600 mm of earth covering over them when
the filling operations are completed.

Grubbing shall be carried out over the full cleared area specified herein.

All grub holes shall be refilled with approved backfill and compacted to at least the same standards as
adjacent undisturbed ground.

3.2.3 Disposal of Cleared Material

All rubbish, timber, rocks and other joose materials generated as a result of clearing and grubbing
operations shall be removed from the site and disposed of at an approved disposal site.

The Contractor shall be responsible for all damage to grass, cultivation, fences, buildings, or stock, by

41/22382/11840 Girraween Sports Precinct 15
Earthworks Package

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.