Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
gp During normal working hours the Contractor shall ensure the continuous presence of a person capable of and responsible for the control of line and level of earthworks. The necessary template and levels shall be kept on the site for the purpose of checking the work during its progress. 3.4.3 Excavation from Cuttings General The cuttings shall be so worked that the best material available, which in the opinion of the Superintendent is suitable material, shall be placed in embankments. Generally all material from cuttings, including drains, which in the opinion of the Superintendent is suitable material, shall be placed in embankments. When material that, in the opinion of the Superintendent, is unsuitable for embankments is encountered in excavation of cuttings and/or the material in the subgrade of the cutting is unsuitable, and/or material from cuttings is in excess of requirements for embankments the material shall be excavated and stockpiled. The Contractor shall be deemed to have satisfied himself as to the full nature of all material to be excavated prior to tendering. No extra payment will be made on account of the nature or condition of the material encountered, other than as may be specifically provided for in the Specification. Batters The sides of cuttings shall be battered and trimmed to a clean and sharp profile, carried around bends in even curves all to lines and slopes as shown on the drawings or as approved by the Superintendent. Any loose rock or material affected by the Contractor's operation which in the opinion of the Superintendent is unstable, shall be trimmed and removed at the Contractor's expense. Undercutting of batter slopes shall not be permitted. Class of Excavation The rate included in the Schedule of Lump Sum Tender shall be deemed to cover excavation in all classes of material irrespective of type and claims will not be considered by the Principal or Superintendent on account of any hard material or rock or any weak material in any excavation. 3.4.4 Construction of Embankments Compaction of material below ground surface under embankments The ground surface shall be compacted to 95% relative dry density (standard compaction) to a depth 150 mm below ground surface. For sand, the ground surface shall be compacted to a density index of not less than 70%. The frequency of testing this compaction shall be at the rate of 1 test per 1,000 m? of surface area. Unsuitable Foundation Material Where in the opinion of the Superintendent the material exposed after stripping on which embankments 41/22382/11840 Girraween Sports Precinct 18 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.