Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= are to be constructed is unsuitable, such material shall be removed and replaced by approved fill material. Any soft or saturated areas shall be surface drained. Fill Material Only material approved by the Superintendent shall be used from cuttings in the construction of embankments. Generally the material used shall comply with the following: Maximum particle size 75mm Percentage passing 0.075mm Not greater than 25% Liquid Limit Not greater than 40% Plasticity Index Not greater than 15% For sand material the figures above and do not apply. Sand fill material shall be approved for use by the Superintendent and shall be free of all deleterious material listed below. Borrow pits and cuttings shall be so worked that the best material available, in the opinion of the Superintendent is made to form the upper layers of embankments. All materials used in embankments shall be to the approval of the Superintendent. Materials which are not to be used in embankment construction are vegetable matter, organic clays and silts, ashes, coal or the like, free draining material susceptible to scouring, dispersible clays, material which is unstable when subject to moisture variation. Embankments Filling shall be carried out in uniform horizontal layers of not more than 200 mm of loose material and compacted as specified. For sand material a maximum layer thickness of 300 mm is applicable. Each layer shall be free of ruts before successive layers are placed. During construction the surface of the embankment shall be shaped so that it is kept higher at the edges, sloping towards the centre to permit safe passage of hauling, rolling and other construction equipment as close to the edge as possible and to ensure that the edges are compacted to the same density as the other parts of the embankment. At the close of work each day, the surface shall be shaped to a crown in the centre to ensure that the surface is well drained. During construction, the differential level of adjacent layers across the embankment shall not exceed 600 mm. Where the ground surface on which an embankment is to be constructed has a transverse slope steeper than 1 on 8 a horizontal step not less than 300 mm high shall be cut into the ground surface at the toe of the batter on the low side. Where the ground surface has a transverse slope steeper than 1 on 3 a series of horizontal steps not less than 300 mm high shall be cut into the ground surface covered by the embankment. These steps 41/22382/11840 Girraween Sports Precinct 19 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.