NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 15

CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
inspection, including any additional inspection necessary following defect identification and rectification.
This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
rate basis current at the time of approval.

Sewer Mains

30. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in
accordance with Council's standards and requirements at no cost to Council.

31. | The proposed package sewerage pumping station shall have emergency storage tanks with a capacity of
24 hour storage to minimise risk of spillage to Burgess Creek.

Town Water Supply

32. The site shall be connected to Council's existing town water supply and be constructed in accordance with
Council's standards and requirements at no cost to Council.

Earthworks

33. Filling works required on site shall be carried out in accordance with Section 3.8 of Council's Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural
surface levels and contours of the adjoining properties must be provided with the application for a
Development Permit for Operational Works for Filling and Drainage.

This may require the design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
Operational Works shall be obtained.

Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on
the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall
not apply.

Acid Sulfate Soils

34. — As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of
100m or greater which extends below 5m AHD will need to be carried out in accordance with State
Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard
appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be
submitted to Council for approval prior to obtaining a Development Permit for Operational Works.

Erosion and Sediment Control

35. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.

In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.

General

36. | The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for Building Works.

37. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application tor Operational Works.

38. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. To
avoid conflict with underground pipes or services, all existing and proposed services required by the
development shall be shown on the plans.

39. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).

RT p:lt. projects\208 girraween sports complex\12.0 documentationidocuments trom chris 090925\1 - approved mcu plans\meu
decision notice\sports fields mcu decision notice.doc

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.