Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
NOOSA COUNCIL IDAS Development Application Decision Notice 7o0f 15 40. | Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. 41. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 42. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. 43. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted unti! all As Constructed information has been supplied and accepted by Council. Environmental Health 44. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises", including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m’), or alternatively the waste area can be roofed, or any other design approved by Council. 45. All bin wash areas in excess of 700mm Square are to be roofed and the floor is to fall to a bucket trap with the waste pre-treated by a grease arrestor prior to discharge to the sewer. The appropriate backflow prevention devices are to be installed at the bin wash area. Bunding set above 75mm is required to exclude excessive rain-water entering these areas. 46. A Trade Waste Application must be submitted prior to the issue of a Development Permit for Building Works. 47. Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and servicing. Where access is restricted, a pump out line is required. 48. A completed Trade Waste application together with an applicable fee and two (2) sets of professionally drawn plans showing the Trade Waste requirements in accordance with the Noosa Trade Waste Policy are to be submitted to Council. 49. The property owner will be responsible for any cost incurred by an approved Cleaning Contractor relating to the cleaning, servicing and contents removal from the grease arrestor, where access to the arrestor is impaired or delayed. 50. The Trade Waste application fee of ($105.00) is required at the time of the application. 51. Trade Waste requirements are required to be in place, inspected and approved prior to the commencement of trading or operation. The appropriate Trade Waste Permits will be issued following approval at final inspection. 52. A place of food preparation and/or cooking is to have the liquid waste connected to a Trade Waste line, that discharges to an approved grease arrestor of a size determined by Council's Trade Waste Policy. 53. All liquid waste produced by the commercial section of the development is “Trade Waste” and is to be treated as required under the Noosa Trade Waste Policy prior to release to the sewer. Environmental Services 54. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact of the development, during construction and operation, on the environment is minimised and that the environmental values of the site and surrounding lands are protected and enhanced. RT p:it. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\mcu decision notice\sports fields mcu decision notice.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.