Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= At all times the requirements of the Workplace Health and Safety Act shall be complied with and all works shall be made safe during the performance of such activities. During construction all care should be taken to ensure any water that may interfere with the progress of the works shall be diverted to keep the trenches and excavations free from water so as to prevent any damage to the works due to flooding or other causes. The necessary pumping items shall be kept on hand to ensure the excavation is constantly dewatered during the progress of the works. 5.3 Bedding Pipes are to be bedded in 5-10mm crushed rock screenings. Bedding material shall be placed as detailed on the design drawings and/or in accordance with Local Authority Standards. Where soft unstable foundation material is excavated below the invert, backfill material shail consist of gravel, crushed stone or other suitable material. All material directly in contact with the pipe shall be within a pH range 4-9 and have a resistivity greater than 500 ohm cms. Select fill may be cement stabilised. Details of the proposed stabilised material shall be approved by the Superintendent prior to installation. The Bed Zone shall be placed to the final required thickness. The bed material shall extend over the full width of the trench and shall be compacted by tamping, rolling and/or vibration to a minimum Density Index (Dl) of 50. Compaction achieved shall be monitored by field testing as directed by the Superintendent. The bed leve! shall be graded to provide for a uniform fall to the discharging end of the pipeline, with line and leve! as shown on the drawings. For pipes with sockets protruding beyond the barrel outside surface, chases shall be dug into the bed and foundation if necessary, in the appropriate positions, so that each pipe is supported along the full length of the barrel and the socket is not subjected to point loading. 5.4 Laying and Jointing of Pipes 5.4.1 Concrete and Fibre Reinforced Concrete Pipes Pipe laying shall begin at the downstream end of the line with the socket or grooved end of the pipe facing upstream. When the pipes are laid, the barrel of each pipe shall be in contact with the bedding material throughout its full length. External joints shall be taped with the manufacturer's supplied tape or rubber external sand bands upon final bedding and alignment. Lifting holes in pipes shall be plugged with 3:1 sand cement mortar, precast tapered concrete plugs, tape 41/22382/11840 Girraween Sports Precinct 29 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.